GT0724 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,810 | $8,370 | n/a |
GT0724 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,554 | $0 | Not Implemented |
GT0724 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,832 | $1,800 | Implemented |
GT0724 # 04 Y:2001 | 04 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,279 | $5,900 | Implemented |
GT0724 # 05 Y:2001 | 05 | 2001 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,956 | $7,500 | Implemented |
GT0724 # 06 Y:2001 | 06 | 2001 | USE OPTIMUM TEMPERATURE | $45,009 | $3,850 | Not Implemented |
GT0723 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,140 | $68,913 | Implemented |
GT0723 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,660 | $825 | Implemented |
GT0723 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,036 | $350 | Implemented |
GT0723 # 05 Y:2001 | 05 | 2001 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $76,655 | $0 | Implemented |
GT0723 # 06 Y:2001 | 06 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,965 | $1,418 | Implemented |
GT0723 # 01 Y:2001 | 01 | 2001 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $21,103 | $60,000 | Implemented |
NC0226 # 04 Y:2001 | 04 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,800 | $400 | Not Implemented |
NC0226 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $2,071 | $407 | Not Implemented |
NC0226 # 01 Y:2001 | 01 | 2001 | DEVELOP A REPAIR/REPLACE POLICY | $10,828 | $12,834 | Not Implemented |
NC0226 # 07 Y:2001 | 07 | 2001 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $23,668 | $26,000 | Not Implemented |
NC0226 # 08 Y:2001 | 08 | 2001 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $93,403 | $-312,000 | Not Implemented |
NC0226 # 02 Y:2001 | 02 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,348 | $500 | Not Implemented |
NC0226 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $279 | $150 | Not Implemented |
NC0226 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $1,122 | $2,225 | Not Implemented |
NC0227 # 03 Y:2001 | 03 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $662 | $308 | Not Implemented |
NC0227 # 04 Y:2001 | 04 | 2001 | IMPROVE COMBUSTION CONTROL CAPABILITY | $89,586 | $60,000 | Not Implemented |
NC0227 # 02 Y:2001 | 02 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $15,815 | $30,000 | Not Implemented |
NC0227 # 15 Y:2001 | 15 | 2001 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $23,716 | $15,000 | Not Implemented |
NC0227 # 05 Y:2001 | 05 | 2001 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $30,612 | $50,000 | Not Implemented |