IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0307 # 01 Y:2004 01 2004 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $151,225 $150,000 Not Implemented
NC0307 # 03 Y:2004 03 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $32,361 $24,000 Not Implemented
NC0307 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,342 $1,456 Not Implemented
NC0307 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $313 $381 Not Implemented
NC0307 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $16,989 $31,278 Not Implemented
NC0307 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,171 $100 Implemented
NC0307 # 02 Y:2004 02 2004 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $72,400 $49,500 Implemented
NC0305 # 05 Y:2004 05 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $2,802 $1,000 Not Implemented
NC0305 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,108 $200 Not Implemented
NC0305 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $349 $100 Implemented
NC0305 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,897 $2,750 Not Implemented
NC0305 # 03 Y:2004 03 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,452 $2,000 Not Implemented
NC0305 # 01 Y:2004 01 2004 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $36,051 $3,500 Not Implemented
NC0305 # 07 Y:2004 07 2004 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $320 $58 Implemented
NC0304 # 01 Y:2004 01 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $25,824 $24,000 n/a
NC0304 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $20,008 $3,000 Implemented
NC0304 # 02 Y:2004 02 2004 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $27,494 $13,050 Implemented
NC0304 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,024 $4,207 Not Implemented
NC0304 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,732 $100 Implemented
NC0304 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,821 $400 Implemented
NC0303 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,426 $18,825 Not Implemented
NC0303 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,224 $100 Implemented
NC0303 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,085 $1,385 Not Implemented
NC0303 # 05 Y:2004 05 2004 REDESIGN PROCESS $73,700 $35,000 Not Implemented
NC0303 # 04 Y:2004 04 2004 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $11,844 $18,280 Not Implemented