Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
164
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0307 # 01 Y:2004 | 01 | 2004 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $151,225 | $150,000 | Not Implemented |
NC0307 # 03 Y:2004 | 03 | 2004 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $32,361 | $24,000 | Not Implemented |
NC0307 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,342 | $1,456 | Not Implemented |
NC0307 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $313 | $381 | Not Implemented |
NC0307 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,989 | $31,278 | Not Implemented |
NC0307 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,171 | $100 | Implemented |
NC0307 # 02 Y:2004 | 02 | 2004 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $72,400 | $49,500 | Implemented |
NC0305 # 05 Y:2004 | 05 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $2,802 | $1,000 | Not Implemented |
NC0305 # 02 Y:2004 | 02 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,108 | $200 | Not Implemented |
NC0305 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $349 | $100 | Implemented |
NC0305 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,897 | $2,750 | Not Implemented |
NC0305 # 03 Y:2004 | 03 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,452 | $2,000 | Not Implemented |
NC0305 # 01 Y:2004 | 01 | 2004 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $36,051 | $3,500 | Not Implemented |
NC0305 # 07 Y:2004 | 07 | 2004 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $320 | $58 | Implemented |
NC0304 # 01 Y:2004 | 01 | 2004 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $25,824 | $24,000 | n/a |
NC0304 # 03 Y:2004 | 03 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $20,008 | $3,000 | Implemented |
NC0304 # 02 Y:2004 | 02 | 2004 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $27,494 | $13,050 | Implemented |
NC0304 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,024 | $4,207 | Not Implemented |
NC0304 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,732 | $100 | Implemented |
NC0304 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,821 | $400 | Implemented |
NC0303 # 03 Y:2004 | 03 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $18,426 | $18,825 | Not Implemented |
NC0303 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,224 | $100 | Implemented |
NC0303 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,085 | $1,385 | Not Implemented |
NC0303 # 05 Y:2004 | 05 | 2004 | REDESIGN PROCESS | $73,700 | $35,000 | Not Implemented |
NC0303 # 04 Y:2004 | 04 | 2004 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $11,844 | $18,280 | Not Implemented |