IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0438 # 04 Y:2011 04 2011 REPAIR OR REPLACE STEAM TRAPS $19,936 $5,500 Not Implemented
NC0438 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,224 $300 Implemented
NC0438 # 02 Y:2011 02 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,972 $7,800 Implemented
NC0438 # 01 Y:2011 01 2011 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $62,448 $94,000 Not Implemented
NC0438 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $1,416 $2,112 Implemented
NC0438 # 06 Y:2011 06 2011 DEVELOP A REPAIR/REPLACE POLICY $5,515 $5,548 Not Implemented
NC0438 # 03 Y:2011 03 2011 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $19,068 $32,000 Not Implemented
NC0438 # 05 Y:2011 05 2011 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $43,023 $92,800 Not Implemented
NC0440 # 02 Y:2011 02 2011 DEVELOP A REPAIR/REPLACE POLICY $15,127 $20,158 Implemented
NC0440 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $157,713 $165,618 Implemented
NC0440 # 05 Y:2011 05 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,312 $8,420 Implemented
NC0440 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,025 $500 Implemented
NC0440 # 03 Y:2011 03 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $3,350 $800 Not Implemented
NC0439 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,953 $100 Implemented
NC0439 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,486 $1,800 Not Implemented
NC0439 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,669 $39,646 Implemented
NC0439 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $330 $106 Implemented
NC0439 # 01 Y:2011 01 2011 USE RADIANT HEATER FOR SPOT HEATING $37,298 $27,675 Not Implemented
NC0439 # 04 Y:2011 04 2011 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,390 $4,200 Implemented
NC0439 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $4,934 $2,393 Implemented
NC0434 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,609 $32,453 Implemented
NC0434 # 06 Y:2011 06 2011 COVER OPEN TANKS $414 $908 Implemented
NC0434 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,138 $2,127 Implemented
NC0434 # 09 Y:2011 09 2011 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $1,039 $876 Implemented
NC0434 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,424 $1,000 Implemented