Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
68
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0545 # 02 Y:2003 | 02 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,737 | $2,750 | Implemented |
MA0545 # 01 Y:2003 | 01 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,190 | $0 | Implemented |
MA0545 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $601 | $0 | Implemented |
MA0545 # 06 Y:2003 | 06 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $199 | $795 | Implemented |
MA0545 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $867 | $340 | Implemented |
MA0545 # 05 Y:2003 | 05 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $219 | $0 | Implemented |
MA0543 # 01 Y:2003 | 01 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,705 | $21,900 | n/a |
MA0543 # 07 Y:2003 | 07 | 2003 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,408 | $527 | Implemented |
MA0543 # 03 Y:2003 | 03 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,265 | $0 | Not Implemented |
MA0543 # 05 Y:2003 | 05 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,953 | $12,400 | Not Implemented |
MA0543 # 02 Y:2003 | 02 | 2003 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $26,717 | $40,000 | Not Implemented |
MA0543 # 06 Y:2003 | 06 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,571 | $12,104 | Implemented |
MA0543 # 04 Y:2003 | 04 | 2003 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $5,292 | $0 | Not Implemented |
MA0542 # 03 Y:2003 | 03 | 2003 | REDUCE VENTILATION AIR | $9,202 | $3,400 | Not Implemented |
MA0542 # 04 Y:2003 | 04 | 2003 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $8,465 | $0 | Implemented |
MA0542 # 05 Y:2003 | 05 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,383 | $0 | Implemented |
MA0542 # 01 Y:2003 | 01 | 2003 | OPTIMIZE PLANT POWER FACTOR | $14,636 | $22,869 | Not Implemented |
MA0542 # 06 Y:2003 | 06 | 2003 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,232 | $500 | Implemented |
MA0542 # 07 Y:2003 | 07 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,659 | $3,400 | Not Implemented |
MA0542 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,600 | $21,400 | Not Implemented |
MA0541 # 01 Y:2003 | 01 | 2003 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $89,343 | $700,000 | n/a |
MA0541 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,861 | $46,350 | Not Implemented |
MA0541 # 03 Y:2003 | 03 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $14,763 | $14,000 | Not Implemented |
MA0541 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,264 | $5,500 | Implemented |
MA0541 # 06 Y:2003 | 06 | 2003 | USE MINIMUM STEAM OPERATING PRESSURE | $5,023 | $5,000 | Implemented |