IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

120

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0389 # 03 Y:2015 03 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $516 $0 Implemented
SU0389 # 04 Y:2015 04 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $10,554 $3,085 Implemented
SU0389 # 06 Y:2015 06 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,731 $2,974 Implemented
SU0389 # 08 Y:2015 08 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $119 $123 Implemented
SU0389 # 09 Y:2015 09 2015 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $372 $804 Implemented
SU0389 # 10 Y:2015 10 2015 UPGRADE OBSOLETE EQUIPMENT $257 $1,070 Implemented
SU0388 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,375 $2,025 Implemented
SU0388 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,565 $1,340 Implemented
SU0367 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,427 $100 Implemented
SU0367 # 10 Y:2014 10 2014 UPGRADE OBSOLETE EQUIPMENT $263 $1,078 Implemented
SU0367 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $712 $582 Implemented
SU0367 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $320 $100 Implemented
SU0343 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,599 $3,200 Implemented
SU0340 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,813 $15,885 Implemented
SU0340 # 02 Y:2013 02 2013 INSULATE BARE EQUIPMENT $1,696 $1,150 Implemented
SU0340 # 01 Y:2013 01 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,153 $0 Implemented
SU0277 # 08 Y:2009 08 2009 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $10,228 $160,000 Implemented
SU0277 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $789 $575 Implemented
SU0277 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,338 $199 Implemented
SU0277 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,251 $0 Implemented
SU0260 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,644 $1,034 Implemented
SU0260 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,228 $0 Implemented
SU0260 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,677 $490 Implemented
SU0260 # 04 Y:2007 04 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $685 $0 Implemented
SU0185 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $19,053 $0 Implemented