IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0400 # 03 Y:1997 03 1997 COVER OPEN TANKS $15,677 $6,578 Implemented
MA0400 # 02 Y:1997 02 1997 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $17,497 $92,676 Not Implemented
MA0400 # 01 Y:1997 01 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $347,702 $505,000 Not Implemented
MA0400 # 05 Y:1997 05 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $388 $0 Implemented
MA0400 # 04 Y:1997 04 1997 INSULATE BARE EQUIPMENT $605 $970 Not Implemented
HO0148 # 02 Y:1997 02 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,600 $250 Implemented
HO0148 # 07 Y:1997 07 1997 $8,676 $100 Implemented
HO0148 # 06 Y:1997 06 1997 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $10,000 $10,000 Implemented
HO0148 # 05 Y:1997 05 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,408 $2,000 Not Implemented
HO0148 # 04 Y:1997 04 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $572 $370 Not Implemented
HO0148 # 03 Y:1997 03 1997 $9,425 $5,000 Implemented
HO0148 # 01 Y:1997 01 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,488 $2,196 Implemented
HO0146 # 06 Y:1997 06 1997 $104,000 $0 Implemented
HO0146 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $238 $234 Not Implemented
HO0146 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $616 $500 Implemented
HO0146 # 03 Y:1997 03 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,400 $6,500 Not Implemented
HO0146 # 04 Y:1997 04 1997 INSULATE BARE EQUIPMENT $16,827 $7,700 Implemented
HO0146 # 05 Y:1997 05 1997 $15,000 $200 Not Implemented
HO0146 # 07 Y:1997 07 1997 RECOVER AND REUSE WASTE MATERIAL $53,760 $0 Implemented
HO0141 # 07 Y:1997 07 1997 $75,000 $40,000 Not Implemented
HO0141 # 06 Y:1997 06 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,640 $0 Not Implemented
HO0141 # 05 Y:1997 05 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,232 $1,000 Implemented
HO0141 # 04 Y:1997 04 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,306 $200 Not Implemented
HO0141 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,226 $400 Not Implemented
HO0141 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $798 $3,720 Not Implemented