IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0473 # 06 Y:2000 06 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,779 $7,000 Implemented
MA0473 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,180 $0 Implemented
MA0472 # 07 Y:2000 07 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $1,195 $3,000 Implemented
MA0472 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,347 $315 Implemented
MA0472 # 04 Y:2000 04 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,713 $9,000 Not Implemented
MA0472 # 08 Y:2000 08 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $1,064 $3,000 Implemented
MA0472 # 05 Y:2000 05 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,589 $2,000 Implemented
MA0472 # 01 Y:2000 01 2000 REDUCE VENTILATION AIR $9,400 $0 Implemented
MA0472 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,991 $10,000 Implemented
MA0472 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $4,166 $2,000 Implemented
HO0237 # 06 Y:2000 06 2000 $2,880 $480 Not Implemented
HO0237 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,410 $11,135 Not Implemented
HO0237 # 09 Y:2000 09 2000 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,980 $200 Not Implemented
HO0237 # 08 Y:2000 08 2000 $2,520 $1,000 Implemented
HO0237 # 07 Y:2000 07 2000 $9,464 $7,000 Not Implemented
HO0237 # 05 Y:2000 05 2000 $7,800 $5,000 Not Implemented
HO0237 # 04 Y:2000 04 2000 $5,780 $6,240 Not Implemented
HO0237 # 03 Y:2000 03 2000 $8,731 $1,000 Not Implemented
HO0237 # 02 Y:2000 02 2000 $91,200 $1,000 Not Implemented
HO0235 # 09 Y:2000 09 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $524 $2,500 Implemented
HO0235 # 08 Y:2000 08 2000 $4,200 $375 Implemented
HO0235 # 07 Y:2000 07 2000 $115,354 $4,000 Not Implemented
HO0235 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,410 $15 Not Implemented
HO0235 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,126 $5,000 Implemented
HO0235 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,960 $11,729 Not Implemented