IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

250

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0745 # 07 Y:2006 07 2006 USE OPTIMUM THICKNESS INSULATION $8,710 $4,000 Implemented
UD0745 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,746 $8,200 Implemented
UD0745 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,408 $0 Implemented
UD0745 # 12 Y:2006 12 2006 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $941 $0 Implemented
UD0743 # 06 Y:2006 06 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,328 $0 Implemented
UD0743 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,000 $1,800 Implemented
UD0743 # 08 Y:2006 08 2006 REPAIR OR REPLACE STEAM TRAPS $18,000 $1,750 Implemented
UD0743 # 09 Y:2006 09 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $17,000 $0 Implemented
UD0743 # 10 Y:2006 10 2006 REDUCE EXCESSIVE BOILER BLOWDOWN $15,000 $0 Implemented
UD0743 # 20 Y:2006 20 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,342 $500 Implemented
UD0743 # 21 Y:2006 21 2006 UPGRADE CONTROLS ON COMPRESSORS $831 $0 Implemented
WV0338 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $24,000 $10,954 Implemented
WV0338 # 03 Y:2006 03 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,026 $0 Implemented
WV0338 # 04 Y:2006 04 2006 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,133 $1,000 Implemented
WV0338 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,593 $0 Implemented
WV0338 # 06 Y:2006 06 2006 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,611 $45 Implemented
WV0338 # 07 Y:2006 07 2006 DEVELOP A REPAIR/REPLACE POLICY $2,505 $709 Implemented
WV0338 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,078 $8 Implemented
WV0338 # 10 Y:2006 10 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,289 $820 Implemented
WV0338 # 11 Y:2006 11 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,129 $590 Implemented
WV0338 # 12 Y:2006 12 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,013 $210 Implemented
WV0338 # 13 Y:2006 13 2006 INSTALL OCCUPANCY SENSORS $983 $580 Implemented
WV0338 # 15 Y:2006 15 2006 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $310 $0 Implemented
UD0736 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $151,099 $230,000 Implemented
UD0736 # 03 Y:2006 03 2006 REPAIR AND ELIMINATE STEAM LEAKS $36,074 $28,000 Implemented