IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0332 # 03 Y:2007 03 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $45,783 $500 Implemented
UM0332 # 04 Y:2007 04 2007 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $26,141 $12,385 Implemented
UM0332 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,954 $638 Implemented
UM0332 # 02 Y:2007 02 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $56,464 $1,000 Implemented
UD0767 # 01 Y:2007 01 2007 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $30,284 $1,500 Implemented
UD0767 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,625 $2,175 Implemented
UD0760 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $563 $48 Implemented
UD0760 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,886 $6,000 Implemented
UD0760 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,006 $1,250 Implemented
UD0760 # 04 Y:2007 04 2007 DEVELOP A REPAIR/REPLACE POLICY $3,677 $13,959 Implemented
UD0760 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $4,030 $2,760 Implemented
UD0760 # 02 Y:2007 02 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,480 $0 Implemented
UD0760 # 01 Y:2007 01 2007 INSULATE BARE EQUIPMENT $10,167 $6 Implemented
UD0755 # 12 Y:2007 12 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,928 $42,500 Implemented
UD0755 # 09 Y:2007 09 2007 RECOVER WASTE HEAT FROM EQUIPMENT $11,340 $2,000 Implemented
UD0755 # 07 Y:2007 07 2007 UPGRADE CONTROLS ON COMPRESSORS $12,600 $15,000 Implemented
UD0755 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,952 $19,500 Implemented
UD0755 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,728 $10,396 Implemented
UD0755 # 01 Y:2007 01 2007 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $73,500 $147,000 Implemented