Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
55
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0308 # 03 Y:2006 | 03 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,070 | $1,250 | Not Implemented |
UM0308 # 01 Y:2006 | 01 | 2006 | ADJUST BURNERS FOR EFFICIENT OPERATION | $3,769 | $500 | Implemented |
UM0308 # 02 Y:2006 | 02 | 2006 | REDUCE VENTILATION AIR | $2,507 | $500 | Implemented |
UM0308 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $392 | $1,000 | Implemented |
UM0308 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $142 | $310 | Not Implemented |
UM0308 # 05 Y:2006 | 05 | 2006 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $536 | $300 | Implemented |
UM0308 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,462 | $3,479 | Not Implemented |
UD0746 # 02 Y:2006 | 02 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $20,324 | $10,000 | Implemented |
UD0746 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $19,239 | $7,105 | Implemented |
UD0746 # 04 Y:2006 | 04 | 2006 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $6,408 | $0 | Implemented |
UD0746 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,123 | $1,530 | Implemented |
UD0746 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $372 | $212 | Not Implemented |
UD0746 # 01 Y:2006 | 01 | 2006 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $26,993 | $2,000 | Not Implemented |
UD0744 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM THICKNESS INSULATION | $17,062 | $7,053 | Not Implemented |
UD0744 # 08 Y:2006 | 08 | 2006 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,657 | $1,195 | Not Implemented |
UD0744 # 03 Y:2006 | 03 | 2006 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $29,099 | $50,000 | Not Implemented |
UD0744 # 07 Y:2006 | 07 | 2006 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $15,843 | $3,000 | Not Implemented |
UD0744 # 09 Y:2006 | 09 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $731 | $0 | Not Implemented |
UD0744 # 04 Y:2006 | 04 | 2006 | USE OPTIMUM THICKNESS INSULATION | $24,529 | $14,670 | Not Implemented |
UD0744 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,118 | $33,800 | Not Implemented |
UD0744 # 01 Y:2006 | 01 | 2006 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $67,027 | $1,500 | Not Implemented |
UD0744 # 02 Y:2006 | 02 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $60,139 | $400,400 | Not Implemented |
UM0301 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,344 | $500 | Not Implemented |
UM0301 # 08 Y:2006 | 08 | 2006 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,415 | $1,363 | Not Implemented |
UM0301 # 10 Y:2006 | 10 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,062 | $300 | Not Implemented |