Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
55
matching recommendationsSIC | 2013 | Sausages And Other Prepared Meats |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0880 # 08 Y:2013 | 08 | 2013 | REDUCE EXCESSIVE BOILER BLOWDOWN | $35,463 | $15,000 | Implemented |
UD0880 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,120 | $1,000 | Implemented |
UD0880 # 06 Y:2013 | 06 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $12,462 | $0 | Implemented |
UD0880 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,196 | $3,400 | Implemented |
UD0880 # 02 Y:2013 | 02 | 2013 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,784 | $5,000 | Implemented |
UD0880 # 05 Y:2013 | 05 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,656 | $0 | Implemented |
UD0866 # 15 Y:2012 | 15 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $9,098 | $10,982 | Implemented |
UD0866 # 11 Y:2012 | 11 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $28,807 | $0 | Implemented |
UD0866 # 10 Y:2012 | 10 | 2012 | USE MINIMUM STEAM OPERATING PRESSURE | $83,103 | $83,103 | Implemented |
UD0866 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,740 | $0 | Implemented |
UD0866 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,378 | $22,134 | Implemented |
UD0866 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,071 | $41,345 | Implemented |
UD0785 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,828 | $98,908 | Implemented |
UD0785 # 02 Y:2008 | 02 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $66,859 | $121,500 | Implemented |
UD0785 # 07 Y:2008 | 07 | 2008 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,742 | $5,924 | Implemented |
UD0785 # 10 Y:2008 | 10 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,512 | $1,000 | Implemented |
UD0763 # 02 Y:2007 | 02 | 2007 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $30,994 | $8,900 | Implemented |
UD0763 # 01 Y:2007 | 01 | 2007 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $36,135 | $5,242 | Implemented |
UD0389 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,929 | $6,000 | Implemented |
UD0389 # 02 Y:1992 | 02 | 1992 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $643 | $50 | Implemented |
UD0389 # 01 Y:1992 | 01 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,419 | $0 | Implemented |
UD0371 # 04 Y:1992 | 04 | 1992 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,388 | $45,000 | Implemented |
UD0371 # 02 Y:1992 | 02 | 1992 | INSTALL SET-BACK TIMERS | $473 | $0 | Implemented |
UD0371 # 01 Y:1992 | 01 | 1992 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,032 | $300 | Implemented |
UD0212 # 01 Y:1987 | 01 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,241 | $1,000 | Implemented |