IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
SIC 2013 Sausages And Other Prepared Meats
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0880 # 08 Y:2013 08 2013 REDUCE EXCESSIVE BOILER BLOWDOWN $35,463 $15,000 Implemented
UD0880 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,120 $1,000 Implemented
UD0880 # 06 Y:2013 06 2013 UPGRADE CONTROLS ON COMPRESSORS $12,462 $0 Implemented
UD0880 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,196 $3,400 Implemented
UD0880 # 02 Y:2013 02 2013 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,784 $5,000 Implemented
UD0880 # 05 Y:2013 05 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,656 $0 Implemented
UD0866 # 15 Y:2012 15 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $9,098 $10,982 Implemented
UD0866 # 11 Y:2012 11 2012 REPAIR OR REPLACE STEAM TRAPS $28,807 $0 Implemented
UD0866 # 10 Y:2012 10 2012 USE MINIMUM STEAM OPERATING PRESSURE $83,103 $83,103 Implemented
UD0866 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,740 $0 Implemented
UD0866 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,378 $22,134 Implemented
UD0866 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,071 $41,345 Implemented
UD0785 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,828 $98,908 Implemented
UD0785 # 02 Y:2008 02 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $66,859 $121,500 Implemented
UD0785 # 07 Y:2008 07 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,742 $5,924 Implemented
UD0785 # 10 Y:2008 10 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,512 $1,000 Implemented
UD0763 # 02 Y:2007 02 2007 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $30,994 $8,900 Implemented
UD0763 # 01 Y:2007 01 2007 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $36,135 $5,242 Implemented
UD0389 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,929 $6,000 Implemented
UD0389 # 02 Y:1992 02 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $643 $50 Implemented
UD0389 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,419 $0 Implemented
UD0371 # 04 Y:1992 04 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,388 $45,000 Implemented
UD0371 # 02 Y:1992 02 1992 INSTALL SET-BACK TIMERS $473 $0 Implemented
UD0371 # 01 Y:1992 01 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,032 $300 Implemented
UD0212 # 01 Y:1987 01 1987 RECOVER WASTE HEAT FROM EQUIPMENT $2,241 $1,000 Implemented