IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

153

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0535 # 03 Y:2016 03 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,206 $1,000 Implemented
UD0935 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,176 $3,100 Not Implemented
UD0935 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,152 $0 Implemented
UD0935 # 03 Y:2015 03 2015 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,230 $2,475 Not Implemented
UD0935 # 04 Y:2015 04 2015 REDUCE EXCESS STEAM BLEEDING $946,498 $1,450,100 Not Implemented
UD0935 # 05 Y:2015 05 2015 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $115,856 $487,083 Not Implemented
UD0917 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $6,046 $6,000 Not Implemented
UD0917 # 05 Y:2014 05 2014 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $14,607 $30,000 Not Implemented
UD0917 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,576 $13,517 Implemented
UD0917 # 03 Y:2014 03 2014 RECOVER AND REUSE COOLING WATER $3,388 $0 Implemented
UD0917 # 02 Y:2014 02 2014 REDUCE FLUID FLOW RATES $3,671 $0 Not Implemented
UD0917 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,376 $0 Implemented
WV0472 # 14 Y:2013 14 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,023 $76 Implemented
WV0472 # 01 Y:2013 01 2013 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $113,347 $560,000 Not Implemented
WV0472 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,173 $11,980 Implemented
WV0472 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,870 $13,557 Implemented
WV0472 # 02 Y:2013 02 2013 REPAIR OR REPLACE STEAM TRAPS $18,055 $9,134 Implemented
WV0472 # 08 Y:2013 08 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,509 $1,000 Implemented
WV0472 # 07 Y:2013 07 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,101 $15,180 Not Implemented
WV0472 # 13 Y:2013 13 2013 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,094 $38 Implemented
WV0472 # 11 Y:2013 11 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,009 $3,180 Not Implemented
WV0472 # 09 Y:2013 09 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,230 $1,700 Implemented
WV0472 # 12 Y:2013 12 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,824 $356 Implemented
WV0472 # 15 Y:2013 15 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,536 $5,377 Not Implemented
WV0472 # 17 Y:2013 17 2013 DEVELOP A REPAIR/REPLACE POLICY $337 $700 Implemented