Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0634 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $704 | $600 | Implemented |
UD0634 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,089 | $132 | Implemented |
UD0634 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,372 | $0 | Implemented |
UD0634 # 02 Y:2001 | 02 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,762 | $400 | Implemented |
UD0633 # 08 Y:2001 | 08 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,374 | $0 | Implemented |
UD0633 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,150 | $1,750 | Implemented |
UD0633 # 05 Y:2001 | 05 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,373 | $600 | Implemented |
UD0633 # 02 Y:2001 | 02 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $17,974 | $3,000 | Implemented |
UD0633 # 01 Y:2001 | 01 | 2001 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $25,095 | $6,000 | Implemented |
UD0628 # 03 Y:2001 | 03 | 2001 | OPTIMIZE PLANT POWER FACTOR | $17,969 | $9,000 | Implemented |
UD0628 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $11,223 | $7,600 | Implemented |
UD0628 # 07 Y:2001 | 07 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,858 | $0 | Implemented |
UD0628 # 09 Y:2001 | 09 | 2001 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,097 | $3,200 | Implemented |
WV0220 # 02 Y:2001 | 02 | 2001 | USE PHOTOCELL CONTROLS | $432 | $300 | Implemented |
WV0220 # 05 Y:2001 | 05 | 2001 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $241 | $36 | Implemented |
WV0220 # 01 Y:2001 | 01 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,623 | $3,010 | Implemented |
WV0220 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,633 | $540 | Implemented |
WV0220 # 10 Y:2001 | 10 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,164 | $1,080 | Implemented |
WV0220 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $804 | $54 | Implemented |
WV0220 # 07 Y:2001 | 07 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,626 | $190 | Implemented |
UD0625 # 08 Y:2001 | 08 | 2001 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $835 | $3,323 | Implemented |
UD0625 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $5,466 | $2,880 | Implemented |
UD0625 # 03 Y:2001 | 03 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,095 | $4,500 | Implemented |
UD0625 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,972 | $315 | Implemented |
UD0625 # 01 Y:2001 | 01 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,708 | $55,000 | Implemented |