IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

414

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0664 # 15 Y:2003 15 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $178 $0 Implemented
WV0253 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,975 $1,800 Implemented
WV0253 # 02 Y:2002 02 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $9,591 $600 Implemented
WV0253 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,713 $250 Implemented
WV0253 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,800 $40 Implemented
WV0253 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $440 $400 Implemented
WV0253 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,922 $0 Implemented
WV0253 # 07 Y:2002 07 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,476 $120 Implemented
WV0253 # 09 Y:2002 09 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $122 $40 Implemented
WV0253 # 10 Y:2002 10 2002 $4,800 $1,000 Implemented
UD0637 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,187 $8,190 Implemented
UD0637 # 02 Y:2002 02 2002 REPROCESS SPENT OILS ON SITE FOR RE-USE $3,149 $3,200 Implemented
UD0637 # 03 Y:2002 03 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,139 $9,000 Implemented
UD0637 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $230 $0 Implemented
UD0637 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $132 $150 Implemented
UD0637 # 08 Y:2002 08 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $55 $12 Implemented
UM0200 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,418 $2,000 Implemented
UM0200 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,869 $750 Implemented
WV0226 # 01 Y:2001 01 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,373 $0 Implemented
WV0226 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,673 $1,100 Implemented
WV0226 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $4,794 $1,008 Implemented
WV0226 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $2,882 $336 Implemented
WV0226 # 08 Y:2001 08 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,542 $100 Implemented
WV0226 # 10 Y:2001 10 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,863 $1,200 Implemented
WV0226 # 12 Y:2001 12 2001 $312,500 $2,000 Implemented