IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

414

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0422 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $691 $3,827 Implemented
UD0422 # 05 Y:1994 05 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,513 $47,000 Implemented
UD0403 # 01 Y:1993 01 1993 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $17,544 $50,000 Implemented
UD0403 # 02 Y:1993 02 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,715 $25,000 Implemented
UD0403 # 03 Y:1993 03 1993 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,873 $202 Implemented
UD0403 # 04 Y:1993 04 1993 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $532 $250 Implemented
UD0374 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,610 $0 Implemented
UD0374 # 02 Y:1992 02 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,979 $0 Implemented
UD0374 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $275 $0 Implemented
UD0374 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,049 $5,280 Implemented
UD0374 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $636 $3,800 Implemented
UD0364 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,121 $14,430 Implemented
UD0333 # 01 Y:1991 01 1991 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,221 $6,000 Implemented
UD0333 # 02 Y:1991 02 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $145,812 $0 Implemented
UD0333 # 03 Y:1991 03 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,976 $0 Implemented
UD0333 # 04 Y:1991 04 1991 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $34,857 $0 Implemented
UD0238 # 01 Y:1987 01 1987 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $20,472 $36,000 Implemented
UD0238 # 02 Y:1987 02 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,814 $0 Implemented
UD0238 # 03 Y:1987 03 1987 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,600 $250 Implemented
UD0238 # 04 Y:1987 04 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,229 $40 Implemented
UD0236 # 02 Y:1987 02 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,157 $0 Implemented
UD0227 # 01 Y:1987 01 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $26,035 $30,000 Implemented
UD0227 # 02 Y:1987 02 1987 OPTIMIZE PLANT POWER FACTOR $4,712 $12,000 Implemented
UD0227 # 04 Y:1987 04 1987 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $534 $6,000 Implemented
UD0213 # 01 Y:1987 01 1987 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,229 $20,000 Implemented