IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0726 # 16 Y:2005 16 2005 UPGRADE CONTROLS ON COMPRESSORS $1,253 $0 Implemented
UD0726 # 15 Y:2005 15 2005 CHECK FOR ACCURACY OF UTILITY / POWER METERS $1,554 $0 Implemented
UD0726 # 13 Y:2005 13 2005 UPGRADE CONTROLS ON COMPRESSORS $3,679 $0 Implemented
UD0726 # 12 Y:2005 12 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,280 $736 Implemented
UD0726 # 11 Y:2005 11 2005 COVER OPEN TANKS $4,429 $1,200 Implemented
UD0726 # 10 Y:2005 10 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,819 $12,560 Implemented
UD0726 # 06 Y:2005 06 2005 REDUCE VENTILATION AIR $26,800 $0 Implemented
UD0726 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,707 $93,840 Implemented
UD0726 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $93,662 $72,100 Implemented
UD0726 # 01 Y:2005 01 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $222,216 $3,730 Implemented
UD0726 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $19,788 $4,000 Implemented
WV0295 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $775 $60 Implemented
WV0295 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $3,815 $2,707 Implemented
WV0295 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,317 $630 Implemented
WV0295 # 06 Y:2004 06 2004 COVER OPEN TANKS $1,229 $2,250 Implemented
WV0295 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,212 $300 Implemented
WV0295 # 12 Y:2004 12 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $396 $0 Implemented
WV0295 # 14 Y:2004 14 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $245 $165 Implemented
WV0190 # 06 Y:2000 06 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,883 $780 Implemented
WV0190 # 01 Y:2000 01 2000 IMPROVE COMBUSTION CONTROL CAPABILITY $204,769 $34,000 Implemented
WV0190 # 11 Y:2000 11 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $66,820 $78,000 Implemented
WV0190 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63,174 $66,000 Implemented
WV0190 # 04 Y:2000 04 2000 COVER OPEN TANKS $11,730 $5,760 Implemented
UD0585 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,347 $100 Implemented
UD0585 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,729 $16,995 Implemented