IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

211

matching recommendations
Reset
SIC 3469 Metal Stampings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0631 # 05 Y:2001 05 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,067 $7,000 Not Implemented
UD0631 # 06 Y:2001 06 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,670 $3,680 Implemented
UD0631 # 07 Y:2001 07 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,361 $588 Not Implemented
UD0631 # 08 Y:2001 08 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,800 $960 Implemented
UD0631 # 09 Y:2001 09 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,671 $0 Implemented
UD0631 # 10 Y:2001 10 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $904 $0 Not Implemented
UD0631 # 11 Y:2001 11 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $797 $1,168 Not Implemented
UD0631 # 12 Y:2001 12 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $534 $680 Not Implemented
UD0631 # 13 Y:2001 13 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $421 $688 Implemented
UD0630 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,607 $720 Implemented
UD0630 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $11,232 $5,000 Implemented
UD0630 # 03 Y:2001 03 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,449 $560 Implemented
UD0630 # 04 Y:2001 04 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $3,432 $700 Not Implemented
UD0630 # 05 Y:2001 05 2001 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,639 $500 Implemented
UD0630 # 06 Y:2001 06 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,272 $88 Implemented
UD0630 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $611 $1,180 Implemented
UD0630 # 08 Y:2001 08 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $300 $0 Not Implemented
UD0569 # 01 Y:1999 01 1999 RECYCLE WHITE WATER $90,440 $0 Not Implemented
UD0569 # 02 Y:1999 02 1999 INCREASE USE OF AUTOMATION $65,250 $0 Implemented
UD0569 # 03 Y:1999 03 1999 $8,400 $2,500 Not Implemented
UD0569 # 04 Y:1999 04 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,058 $12,380 Not Implemented
UD0569 # 05 Y:1999 05 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,848 $632 Implemented
UD0482 # 01 Y:1996 01 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $40,000 $20,000 Implemented
UD0482 # 02 Y:1996 02 1996 OPTIMIZE PLANT POWER FACTOR $5,827 $3,000 Implemented
UD0482 # 03 Y:1996 03 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $40,000 $10,000 Not Implemented