IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

207

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0801 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,877 $16,721 Implemented
UD0801 # 05 Y:2009 05 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,100 $14,833 Implemented
UD0801 # 07 Y:2009 07 2009 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $993 $45,000 Implemented
UD0779 # 12 Y:2008 12 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,658 $1,000 Implemented
UD0779 # 11 Y:2008 11 2008 $4,322 $0 Implemented
UD0779 # 08 Y:2008 08 2008 INSULATE BARE EQUIPMENT $8,895 $412 Implemented
UD0779 # 06 Y:2008 06 2008 IMPROVE COMBUSTION CONTROL CAPABILITY $75,942 $100,000 Implemented
UD0779 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $13,503 $3,318 Implemented
UD0779 # 04 Y:2008 04 2008 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) $13,555 $500 Implemented
UD0779 # 03 Y:2008 03 2008 REPLACE BOILER $17,736 $65,000 Implemented
UD0779 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $95,648 $1,000 Implemented
UD0779 # 14 Y:2008 14 2008 COVER OPEN TANKS $537 $360 Implemented
UD0779 # 13 Y:2008 13 2008 INSULATE BARE EQUIPMENT $1,228 $100 Implemented
UD0712 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,715 $60 Implemented
UD0712 # 02 Y:2005 02 2005 UPGRADE CONTROLS ON COMPRESSORS $8,635 $1,000 Implemented
UD0712 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,839 $839 Implemented
UD0712 # 07 Y:2005 07 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,166 $525 Implemented
UD0712 # 11 Y:2005 11 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $259 $1,000 Implemented
UD0695 # 13 Y:2004 13 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $397 $756 Implemented
UD0695 # 11 Y:2004 11 2004 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $784 $0 Implemented
UD0695 # 10 Y:2004 10 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,110 $0 Implemented
UD0695 # 08 Y:2004 08 2004 USE MINIMUM SAFE OVEN VENTILATION $2,564 $0 Implemented
UD0695 # 15 Y:2004 15 2004 AIR CONDITION ONLY SPACE NECESSARY $339 $0 Implemented
UD0695 # 09 Y:2004 09 2004 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,331 $175 Implemented
UD0695 # 04 Y:2004 04 2004 USE OPTIMUM TEMPERATURE $7,076 $9 Implemented