IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

388

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0864 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,307 $2,925 Implemented
UD0864 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,307 $2,925 Implemented
UD0848 # 01 Y:2012 01 2012 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $550 $1,000 Not Implemented
UD0848 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $6,519 $5,000 Implemented
UD0848 # 03 Y:2012 03 2012 MINIMIZE WATER USAGE $1,496 $1,000 Not Implemented
UD0848 # 04 Y:2012 04 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,458 $0 Not Implemented
UD0848 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $239 $0 Not Implemented
UD0848 # 06 Y:2012 06 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,962 $1,000 Not Implemented
UD0848 # 07 Y:2012 07 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,543 $0 Implemented
UD0848 # 08 Y:2012 08 2012 RECOVER WASTE HEAT FROM EQUIPMENT $2,209 $1,000 Not Implemented
UD0848 # 09 Y:2012 09 2012 REDUCE VENTILATION AIR $882 $300 Implemented
UD0848 # 10 Y:2012 10 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $834 $600 Not Implemented
UD0801 # 01 Y:2009 01 2009 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $18,742 $14,833 Implemented
UD0801 # 02 Y:2009 02 2009 REDUCE VENTILATION AIR $10,610 $14,833 Implemented
UD0801 # 03 Y:2009 03 2009 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,599 $14,833 Implemented
UD0801 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,877 $16,721 Implemented
UD0801 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $62 $0 Not Implemented
UD0801 # 07 Y:2009 07 2009 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $993 $45,000 Implemented
UD0801 # 06 Y:2009 06 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,087 $0 Not Implemented
UD0801 # 05 Y:2009 05 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,100 $14,833 Implemented
UD0779 # 01 Y:2008 01 2008 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $255,168 $200,000 Not Implemented
UD0779 # 15 Y:2008 15 2008 RECOVER WASTE HEAT FROM EQUIPMENT $481 $2,000 Not Implemented
UD0779 # 14 Y:2008 14 2008 COVER OPEN TANKS $537 $360 Implemented
UD0779 # 13 Y:2008 13 2008 INSULATE BARE EQUIPMENT $1,228 $100 Implemented
UD0779 # 12 Y:2008 12 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,658 $1,000 Implemented