IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

262

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0456 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $10,700 $24,000 Implemented
UD0456 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,644 $12,083 Implemented
UD0456 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,574 $58,500 Implemented
UD0456 # 06 Y:1995 06 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,680 $0 Implemented
UD0445 # 01 Y:1994 01 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $262 $0 Implemented
UD0445 # 02 Y:1994 02 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,105 $1,500 Implemented
UD0445 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,283 $1,845 Implemented
UD0445 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,287 $1,920 Implemented
UD0445 # 05 Y:1994 05 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,835 $10,000 Implemented
UD0437 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $359 $375 Implemented
WV0009 # 02 Y:1993 02 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $153 $194 Implemented
WV0009 # 05 Y:1993 05 1993 RECOVER WASTE HEAT FROM EQUIPMENT $1,163 $976 Implemented
WV0009 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $425 $295 Implemented
WV0009 # 07 Y:1993 07 1993 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $27,394 $1,440 Implemented
ND0019 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,082 $1,170 Implemented
ND0019 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,160 $200 Implemented
ND0019 # 04 Y:1992 04 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $384 $400 Implemented
ND0020 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,080 $400 Implemented
ND0020 # 05 Y:1992 05 1992 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $232 $300 Implemented
ND0020 # 06 Y:1992 06 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $223 $400 Implemented
UD0336 # 01 Y:1991 01 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,806 $10,000 Implemented
UD0336 # 02 Y:1991 02 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,950 $5,000 Implemented
UD0336 # 03 Y:1991 03 1991 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $8,317 $300 Implemented
UD0336 # 04 Y:1991 04 1991 INSTALL SET-BACK TIMERS $5,078 $0 Implemented
UD0274 # 01 Y:1989 01 1989 REDUCE VENTILATION AIR $8,923 $500 Implemented