IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

126

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0833 # 01 Y:2011 01 2011 INSTALL OCCUPANCY SENSORS $2,272 $300 Implemented
UD0833 # 02 Y:2011 02 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,467 $25 Implemented
UD0833 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,343 $500 Implemented
UD0833 # 10 Y:2011 10 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $844 $50 Implemented
UD0833 # 12 Y:2011 12 2011 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $37,935 $100 Implemented
UD0833 # 15 Y:2011 15 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,435 $100 Implemented
WV0424 # 02 Y:2011 02 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,755 $0 Implemented
WV0424 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,339 $48 Implemented
WV0424 # 04 Y:2011 04 2011 DEVELOP A REPAIR/REPLACE POLICY $1,845 $902 Implemented
WV0424 # 06 Y:2011 06 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,463 $1,000 Implemented
WV0424 # 11 Y:2011 11 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $395 $360 Implemented
WV0423 # 04 Y:2011 04 2011 REPAIR AND ELIMINATE STEAM LEAKS $1,472 $626 Implemented
WV0423 # 05 Y:2011 05 2011 INSTALL TIMERS AND/OR THERMOSTATS $1,173 $2,443 Implemented
WV0423 # 06 Y:2011 06 2011 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $1,041 $1,000 Implemented
WV0423 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $521 $89 Implemented
WV0423 # 08 Y:2011 08 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $428 $183 Implemented
WV0423 # 09 Y:2011 09 2011 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $343 $177 Implemented
WV0423 # 12 Y:2011 12 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $272 $139 Implemented
UD0832 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,751 $40,000 Implemented
UD0832 # 02 Y:2011 02 2011 DISCONNECT BALLASTS $2,570 $250 Implemented
UD0832 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $1,977 $1,063 Implemented
UD0832 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,419 $39,141 Implemented
UD0832 # 06 Y:2011 06 2011 UPGRADE OBSOLETE EQUIPMENT $4,243 $4,728 Implemented
UD0832 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $986 $500 Implemented
UD0832 # 08 Y:2011 08 2011 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $5,424 $500 Implemented