IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0807 # 05 Y:2011 05 2011 UPGRADE CONTROLS ON COMPRESSORS $18,895 $0 Implemented
OK0807 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,936 $4,200 Implemented
OK0807 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,980 $3,757 Not Implemented
OK0807 # 08 Y:2011 08 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,163 $12,100 Not Implemented
OK0807 # 09 Y:2011 09 2011 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $7,260 $14,928 Not Implemented
OK0760 # 01 Y:2008 01 2008 $449,795 $1,583,250 Implemented
OK0760 # 02 Y:2008 02 2008 $6,623 $1,000 Implemented
OK0760 # 03 Y:2008 03 2008 $2,970 $1,034 Implemented
OK0730 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $26,839 $1,000 Not Implemented
OK0730 # 02 Y:2006 02 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,500 $1,237 Implemented
OK0730 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,533 $3,500 Implemented
OK0730 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $948 $158 Not Implemented
OK0730 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150 $767 Implemented
OK0730 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,565 $8,601 Not Implemented
OK0730 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,886 $1,767 Implemented
OK0630 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,953 $300 Implemented
OK0630 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,400 $0 Not Implemented
OK0630 # 03 Y:2001 03 2001 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,994 $3,700 Implemented
OK0630 # 04 Y:2001 04 2001 INSTALL SET-BACK TIMERS $11,800 $3,370 Implemented
OK0630 # 05 Y:2001 05 2001 $28,600 $5,000 Not Implemented
OK0630 # 06 Y:2001 06 2001 $115,000 $180,000 Not Implemented
OK0630 # 07 Y:2001 07 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,542 $1,800 Not Implemented
OK0623 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,052 $6,513 Implemented
OK0623 # 02 Y:2001 02 2001 USE OPTIMUM THICKNESS INSULATION $8,776 $550 Implemented
OK0623 # 03 Y:2001 03 2001 INSTALL SET-BACK TIMERS $6,800 $1,035 Not Implemented