Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

411

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0790 # 07 Y:2010 07 2010 OPTIMIZE PLANT POWER FACTOR $3,031 $11,550 Not Implemented
OK0790 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,627 $20,203 Implemented
OK0790 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,084 $9,806 Not Implemented
OK0790 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $245 $13 Implemented
OK0790 # 11 Y:2010 11 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $334 $418 Implemented
OK0741 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,666 $860 Not Implemented
OK0741 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $8,334 $7,480 Not Implemented
OK0741 # 04 Y:2007 04 2007 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,042 $6,800 Not Implemented
OK0741 # 05 Y:2007 05 2007 INSTALL SET-BACK TIMERS $273 $248 Not Implemented
OK0741 # 01 Y:2007 01 2007 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $144,120 $500,000 Not Implemented
OK0731 # 01 Y:2006 01 2006 USE SOLAR HEAT FOR HEAT $97,944 $80,060 Not Implemented
OK0731 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,213 $0 Implemented
OK0731 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,514 $3,851 Not Implemented
OK0731 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,650 $9,975 Not Implemented
OK0731 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $1,071 $3,949 Implemented
OK0731 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $732 $727 Implemented
OK0731 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,083 $68,849 Implemented
OK0702 # 07 Y:2005 07 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,165 $36,140 Not Implemented
OK0702 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $725 $480 Not Implemented
OK0702 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $234 $530 Implemented
OK0702 # 04 Y:2005 04 2005 INSTALL SET-BACK TIMERS $896 $1,540 Not Implemented
OK0702 # 03 Y:2005 03 2005 INSTALL OCCUPANCY SENSORS $1,148 $582 Not Implemented
OK0702 # 02 Y:2005 02 2005 USE POWER DURING OFF-PEAK PERIODS $21,518 $6,899 Not Implemented
OK0702 # 01 Y:2005 01 2005 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $22,000 $6,600 Not Implemented
OK0699 # 01 Y:2004 01 2004 $9,780 $6,150 Implemented