IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0332 # 01 Y:1990 01 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,937 $900 Implemented
OK0332 # 04 Y:1990 04 1990 RECOVER WASTE HEAT FROM EQUIPMENT $7,747 $1,641 Implemented
OK0331 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,918 $3,000 Not Implemented
OK0332 # 06 Y:1990 06 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,410 $1,070 Implemented
OK0332 # 02 Y:1990 02 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,898 $0 Not Implemented
OK0331 # 01 Y:1990 01 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,171 $0 Implemented
OK0331 # 04 Y:1990 04 1990 INSTALL TIMERS AND/OR THERMOSTATS $108 $150 Implemented
OK0332 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,085 $0 Implemented
OK0331 # 03 Y:1990 03 1990 INSULATE BARE EQUIPMENT $382 $252 Implemented
OK0331 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16 $17 Not Implemented
OK0332 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $98 $102 Implemented
OK0327 # 08 Y:1990 08 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,670 $17,150 Implemented
OK0327 # 10 Y:1990 10 1990 INSULATE BARE EQUIPMENT $7,033 $27,000 Not Implemented
OK0328 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $519 $0 Implemented
OK0327 # 04 Y:1990 04 1990 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $7,590 $4,484 Not Implemented
OK0327 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,932 $3,700 Implemented
OK0325 # 01 Y:1990 01 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,545 $0 Implemented
OK0328 # 01 Y:1990 01 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $38,923 $18,700 Not Implemented
OK0326 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $87 $0 Implemented
OK0328 # 03 Y:1990 03 1990 INSULATE BARE EQUIPMENT $536 $2,080 Not Implemented
OK0325 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $652 $3,027 Not Implemented
OK0327 # 09 Y:1990 09 1990 INSTALL TIMERS AND/OR THERMOSTATS $232 $440 Not Implemented
OK0325 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $570 $0 Implemented
OK0328 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,170 $1,500 Implemented
OK0327 # 03 Y:1990 03 1990 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $28,082 $13,087 Implemented