Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
134
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0605 # 08 Y:2000 | 08 | 2000 | MODIFY WORKLOAD | $958,400 | $500,000 | Not Implemented |
OK0605 # 05 Y:2000 | 05 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $232,800 | $280,000 | Not Implemented |
OK0605 # 06 Y:2000 | 06 | 2000 | PURCHASE MATERIAL FROM SUPPLIER IN CUSTOMIZED PACKAGING | $528,240 | $500,000 | Not Implemented |
OK0605 # 02 Y:2000 | 02 | 2000 | IMPROVE COMBUSTION CONTROL CAPABILITY | $606,630 | $500,000 | Not Implemented |
OK0605 # 01 Y:2000 | 01 | 2000 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $6,168,500 | $723,000 | Not Implemented |
OK0605 # 03 Y:2000 | 03 | 2000 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $606,250 | $3,000,000 | Not Implemented |
OK0605 # 07 Y:2000 | 07 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $5,473,600 | $4,750,000 | Not Implemented |
OK0605 # 04 Y:2000 | 04 | 2000 | MODIFY WORKLOAD | $1,214,000 | $850,000 | Not Implemented |
OK0609 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,878 | $7,865 | Not Implemented |
OK0609 # 03 Y:2000 | 03 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,112 | $0 | Implemented |
OK0609 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $905 | $779 | Not Implemented |
OK0609 # 04 Y:2000 | 04 | 2000 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $4,212 | $0 | Not Implemented |
OK0608 # 07 Y:2000 | 07 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $54,025 | $10,000 | Not Implemented |
OK0608 # 03 Y:2000 | 03 | 2000 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $41,230 | $14,200 | Not Implemented |
OK0608 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,670 | $1,060 | Implemented |
OK0608 # 01 Y:2000 | 01 | 2000 | INSTALL SET-BACK TIMERS | $851 | $263 | Implemented |
OK0608 # 05 Y:2000 | 05 | 2000 | PAY BILLS ON TIME TO AVOID LATE FEES | $14,152 | $0 | Implemented |
OK0608 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,589 | $5,995 | Implemented |
OK0608 # 06 Y:2000 | 06 | 2000 | INSTALL SOLID WASTE INCINERATOR FOR HEAT | $90,789 | $1,025,000 | Not Implemented |
OK0606 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $67 | $66 | Implemented |
OK0606 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $596 | $300 | Implemented |
OK0606 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,049 | $0 | Implemented |
OK0606 # 02 Y:2000 | 02 | 2000 | AIR CONDITION ONLY SPACE NECESSARY | $291 | $112 | Implemented |
OK0606 # 01 Y:2000 | 01 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $59,500 | $115,187 | Not Implemented |
OK0607 # 01 Y:2000 | 01 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,830 | $200 | Implemented |