IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

134

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0605 # 08 Y:2000 08 2000 MODIFY WORKLOAD $958,400 $500,000 Not Implemented
OK0605 # 05 Y:2000 05 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $232,800 $280,000 Not Implemented
OK0605 # 06 Y:2000 06 2000 PURCHASE MATERIAL FROM SUPPLIER IN CUSTOMIZED PACKAGING $528,240 $500,000 Not Implemented
OK0605 # 02 Y:2000 02 2000 IMPROVE COMBUSTION CONTROL CAPABILITY $606,630 $500,000 Not Implemented
OK0605 # 01 Y:2000 01 2000 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $6,168,500 $723,000 Not Implemented
OK0605 # 03 Y:2000 03 2000 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $606,250 $3,000,000 Not Implemented
OK0605 # 07 Y:2000 07 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $5,473,600 $4,750,000 Not Implemented
OK0605 # 04 Y:2000 04 2000 MODIFY WORKLOAD $1,214,000 $850,000 Not Implemented
OK0609 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,878 $7,865 Not Implemented
OK0609 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,112 $0 Implemented
OK0609 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $905 $779 Not Implemented
OK0609 # 04 Y:2000 04 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,212 $0 Not Implemented
OK0608 # 07 Y:2000 07 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $54,025 $10,000 Not Implemented
OK0608 # 03 Y:2000 03 2000 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $41,230 $14,200 Not Implemented
OK0608 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,670 $1,060 Implemented
OK0608 # 01 Y:2000 01 2000 INSTALL SET-BACK TIMERS $851 $263 Implemented
OK0608 # 05 Y:2000 05 2000 PAY BILLS ON TIME TO AVOID LATE FEES $14,152 $0 Implemented
OK0608 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,589 $5,995 Implemented
OK0608 # 06 Y:2000 06 2000 INSTALL SOLID WASTE INCINERATOR FOR HEAT $90,789 $1,025,000 Not Implemented
OK0606 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $67 $66 Implemented
OK0606 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $596 $300 Implemented
OK0606 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,049 $0 Implemented
OK0606 # 02 Y:2000 02 2000 AIR CONDITION ONLY SPACE NECESSARY $291 $112 Implemented
OK0606 # 01 Y:2000 01 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $59,500 $115,187 Not Implemented
OK0607 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,830 $200 Implemented