IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0663 # 07 Y:2003 07 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $26,035 $2,100 Not Implemented
OK0662 # 01 Y:2003 01 2003 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $832 $3,222 Not Implemented
OK0662 # 02 Y:2003 02 2003 INSTALL OCCUPANCY SENSORS $181 $300 Not Implemented
OK0662 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,135 $3,289 Not Implemented
OK0662 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $406 $221 Not Implemented
OK0662 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $165 $864 Not Implemented
OK0662 # 06 Y:2003 06 2003 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,326 $23,100 n/a
OK0662 # 07 Y:2003 07 2003 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,701 $1,011 Not Implemented
OK0662 # 08 Y:2003 08 2003 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,730 $1,000 Not Implemented
OK0661 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $72,173 $0 Not Implemented
OK0661 # 02 Y:2003 02 2003 $20,400 $0 Implemented
OK0661 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $8,245 $7,483 Not Implemented
OK0661 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,319 $823 Implemented
OK0661 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $1,271 $3,206 Not Implemented
OK0661 # 06 Y:2003 06 2003 USE COMPRESSOR AIR FILTERS $3,339 $168 Not Implemented
OK0661 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $441 $262 Not Implemented
OK0661 # 08 Y:2003 08 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,061 $45,000 Implemented
OK0661 # 09 Y:2003 09 2003 $11,440 $2,500 Implemented
OK0658 # 01 Y:2003 01 2003 UPGRADE CONTROLS ON COMPRESSORS $51,704 $45,000 Implemented
OK0658 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $25,266 $0 Not Implemented
OK0658 # 03 Y:2003 03 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,031 $0 Implemented
OK0658 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,978 $367 Implemented
OK0658 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,150 $5,273 Implemented
OK0658 # 06 Y:2003 06 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $30,454 $60,000 Not Implemented
OK0658 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,028 $117 Not Implemented