IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

110

matching recommendations
Reset
NAICS 321212 Softwood Veneer and Plywood Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0633 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $2,456 $1,771 Not Implemented
OR0633 # 02 Y:2014 02 2014 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $392,710 $105,114 Not Implemented
OR0633 # 01 Y:2014 01 2014 UPGRADE CONTROLS ON COMPRESSORS $107,219 $4,630 Not Implemented
OR0581 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $27,601 $81,000 Not Implemented
OR0581 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $7,488 $6,761 Not Implemented
OR0581 # 04 Y:2012 04 2012 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $36,155 $7,334 Not Implemented
OR0581 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,590 $16,590 Not Implemented
OR0581 # 02 Y:2012 02 2012 UPGRADE CONTROLS ON COMPRESSORS $30,460 $37,511 Not Implemented
OR0581 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,161 $1,000 Not Implemented
OR0567 # 07 Y:2011 07 2011 ELIMINATE/REDUCE AN OPERATION $17,603 $2,480 Not Implemented
OR0567 # 06 Y:2011 06 2011 INSULATE BARE EQUIPMENT $1,248 $2,547 Implemented
OR0567 # 05 Y:2011 05 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,000 $5,580 Implemented
OR0567 # 04 Y:2011 04 2011 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,800 $6,700 Not Implemented
OR0567 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $878 $737 Not Implemented
OR0567 # 02 Y:2011 02 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,491 $8,300 Not Implemented
OR0567 # 01 Y:2011 01 2011 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $2,000 $1,510 Implemented
OR0551 # 02 Y:2009 02 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $28,529 $42,146 Implemented
OR0551 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,500 $0 Not Implemented
OR0551 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $28,320 $48,980 Implemented
OR0551 # 05 Y:2009 05 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $83,890 $100,800 Implemented
OR0551 # 01 Y:2009 01 2009 UPGRADE CONTROLS ON COMPRESSORS $77,191 $50,820 Implemented
OR0545 # 03 Y:2009 03 2009 CONSIDER INTERMEDIATE OR ECONOMY SIZE AUTOS / TRUCKS $149,500 $380,000 Not Implemented
OR0545 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $40,900 $40,900 Implemented
OR0545 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,200 $58,700 Implemented
OR0545 # 02 Y:2009 02 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $2,700 $4,100 Not Implemented