IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

185

matching recommendations
Reset
SIC 2037 Frozen Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0557 # 02 Y:2010 02 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,866 $6,763 Not Implemented
OR0557 # 03 Y:2010 03 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,416 $500 Not Implemented
OR0557 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,893 $3,858 Not Implemented
OR0557 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,655 $1,655 Not Implemented
OR0557 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,035 $3,858 Not Implemented
OR0557 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,471 $1,471 Not Implemented
OR0557 # 08 Y:2010 08 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $615 $353 Not Implemented
OR0557 # 09 Y:2010 09 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $23,079 $87,827 Not Implemented
OR0459 # 01 Y:2004 01 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,500 $10,500 Not Implemented
OR0459 # 02 Y:2004 02 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $9,750 $300 Implemented
OR0459 # 03 Y:2004 03 2004 UPGRADE CONTROLS ON COMPRESSORS $4,820 $36,600 Implemented
OR0459 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $34,250 $2,000 Implemented
OR0459 # 05 Y:2004 05 2004 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $5,330 $2,825 Implemented
OR0459 # 06 Y:2004 06 2004 OPTIMIZE PLANT POWER FACTOR $2,730 $5,130 Implemented
OR0457 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,600 $25,000 Implemented
OR0457 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,140 $10,000 Not Implemented
OR0457 # 03 Y:2004 03 2004 UPGRADE CONTROLS ON COMPRESSORS $31,300 $0 Implemented
OR0457 # 04 Y:2004 04 2004 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,100 $42,000 Not Implemented
OR0457 # 05 Y:2004 05 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $18,900 $0 Implemented
OR0457 # 06 Y:2004 06 2004 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $2,520 $300 Implemented
OR0371 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $3,523 $6,600 Implemented
OR0371 # 02 Y:2000 02 2000 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $16,300 $20,000 Implemented
OR0371 # 03 Y:2000 03 2000 $142,687 $81,200 Not Implemented
OR0371 # 04 Y:2000 04 2000 INCREASE USE OF AUTOMATION $25,665 $2,234 Not Implemented
OR0311 # 01 Y:1998 01 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $112,722 $650,500 Not Implemented