IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0745 # 01 Y:2021 01 2021 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $11,633 $395 Implemented
OR0745 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,360 $542 Implemented
OR0745 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,286 $485 Implemented
OR0744 # 05 Y:2021 05 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,065 $18,105 Implemented
OR0744 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,766 $8,671 Not Implemented
OR0744 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,963 $2,340 Implemented
OR0744 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $15,238 $36,792 Implemented
OR0744 # 01 Y:2021 01 2021 MINIMIZE WATER USAGE $2,348 $0 Implemented
OR0739 # 02 Y:2021 02 2021 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $12,852 $1,794 Not Implemented
OR0739 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,888 $0 Implemented
OR0739 # 03 Y:2021 03 2021 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $11,419 $32,321 Not Implemented
OR0743 # 01 Y:2021 01 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $46,625 $0 Implemented
OR0743 # 03 Y:2021 03 2021 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $29,553 $281,475 Implemented
OR0743 # 02 Y:2021 02 2021 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,808 $8,548 Implemented
OR0742 # 02 Y:2021 02 2021 REDESIGN PROCESS $3,895 $0 Implemented
OR0742 # 03 Y:2021 03 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,662 $6,857 Not Implemented
OR0742 # 04 Y:2021 04 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $10,200 $38,018 Not Implemented
OR0742 # 01 Y:2021 01 2021 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,010 $0 Implemented
OR0741 # 03 Y:2021 03 2021 USE HEAT PUMP FOR SPACE CONDITIONING $25,522 $19,860 Not Implemented
OR0741 # 02 Y:2021 02 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $56,371 $0 Not Implemented
OR0741 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,176 $40,448 Not Implemented
OR0740 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,831 $84,560 Implemented
OR0740 # 04 Y:2021 04 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $39,964 $60,439 Implemented
OR0740 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $54,988 $79,709 Implemented
OR0740 # 02 Y:2021 02 2021 UPGRADE OBSOLETE EQUIPMENT $68,316 $149,022 Not Implemented