IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

395

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0537 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,096 $67,533 Implemented
LE0537 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,920 $245,000 Implemented
DL0197 # 09 Y:2021 09 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,313 $39,529 Implemented
DL0197 # 06 Y:2021 06 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,960 $173,544 Implemented
DL0197 # 05 Y:2021 05 2021 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,034 $1,300 Implemented
DL0197 # 04 Y:2021 04 2021 INSTALL TIMERS AND/OR THERMOSTATS $730 $135 Implemented
DL0197 # 03 Y:2021 03 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,710 $0 Implemented
LE0509 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,834 $2,500 Implemented
LE0509 # 03 Y:2021 03 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,755 $56,400 Implemented
LE0509 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,037 $8,000 Implemented
LE0509 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,633 $9,000 Implemented
DL0182 # 09 Y:2020 09 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $800 $879 Implemented
DL0182 # 02 Y:2020 02 2020 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $33,900 $25,200 Implemented
DL0182 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $1,910 $0 Implemented
LE0489 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,668 $21,820 Implemented
LE0489 # 07 Y:2020 07 2020 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $9,314 $30,000 Implemented
LE0489 # 05 Y:2020 05 2020 RECOVER WASTE HEAT FROM EQUIPMENT $5,400 $12,000 Implemented
WV0584 # 06 Y:2019 06 2019 DEVELOP A REPAIR/REPLACE POLICY $7,129 $675 Implemented
WV0584 # 03 Y:2019 03 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $44,593 $129,500 Implemented
WV0584 # 09 Y:2019 09 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,899 $510 Implemented
WV0584 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $18,530 $6,283 Implemented
WV0584 # 10 Y:2019 10 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,028 $5,443 Implemented
WV0584 # 11 Y:2019 11 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $876 $358 Implemented
WV0584 # 07 Y:2019 07 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,503 $1,000 Implemented
WV0581 # 07 Y:2019 07 2019 DEVELOP A REPAIR/REPLACE POLICY $4,849 $738 Implemented