IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

80

matching recommendations
Reset
SIC 3462 Iron And Steel Forgings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0468 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,375 $186,863 Implemented
LE0468 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,956 $35,000 Not Implemented
LE0468 # 02 Y:2019 02 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $76,637 $55,000 Implemented
LE0468 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $106,181 $0 Not Implemented
LE0130 # 07 Y:2002 07 2002 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $105,753 $60,000 Not Implemented
LE0130 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $5,934 $150 Not Implemented
LE0130 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $583 $180 Not Implemented
LE0130 # 03 Y:2002 03 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,040 $0 Implemented
LE0130 # 04 Y:2002 04 2002 IMPROVE COMBUSTION CONTROL CAPABILITY $8,789 $1,000 Implemented
LE0130 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,677 $0 Implemented
LE0130 # 06 Y:2002 06 2002 IMPROVE LUBRICATION PRACTICES $7,373 $400 Not Implemented
WV0223 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,270 $124 Implemented
WV0223 # 09 Y:2001 09 2001 $216,000 $400,000 Not Implemented
WV0223 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,194 $1,000 Not Implemented
WV0223 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,692 $300 Implemented
WV0223 # 07 Y:2001 07 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $13,680 $220 Implemented
WV0223 # 04 Y:2001 04 2001 RECOVER WASTE HEAT FROM EQUIPMENT $6,630 $386 Not Implemented
WV0223 # 08 Y:2001 08 2001 $92,576 $12,000 Not Implemented
WV0223 # 05 Y:2001 05 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,635 $1,344 Implemented
WV0223 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,567 $44 Implemented
WV0222 # 08 Y:2001 08 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,491 $44 Implemented
WV0222 # 09 Y:2001 09 2001 BURN WASTE OIL FOR HEAT $2,857 $3,172 Not Implemented
WV0222 # 10 Y:2001 10 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,376 $1,528 Not Implemented
WV0222 # 11 Y:2001 11 2001 RECYCLE FLUORESCENT LAMPS $3,390 $352 Implemented
WV0222 # 12 Y:2001 12 2001 $45,760 $5,000 Implemented