IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

95

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0416 # 16 Y:2016 16 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $704 $3,408 Implemented
LE0416 # 12 Y:2016 12 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,521 $4,533 Implemented
LE0416 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $85,792 $97,000 Implemented
LE0416 # 02 Y:2016 02 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $22,973 $9,000 Implemented
LE0416 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $43,389 $1,000 Implemented
LE0415 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $958 $25 Implemented
LE0415 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,614 $1,000 Implemented
LE0415 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $105,231 $98,175 Implemented
LE0415 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,836 $35,700 Implemented
LE0415 # 09 Y:2016 09 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $17,395 $67,000 Implemented
LE0413 # 07 Y:2016 07 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,462 $25,000 Implemented
LE0413 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,404 $15,000 Implemented
LE0413 # 05 Y:2016 05 2016 INSTALL TIMERS AND/OR THERMOSTATS $482 $590 Implemented
LE0413 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $973 $1,000 Implemented
LE0413 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $1,494 $725 Implemented
LE0413 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,124 $500 Implemented
LE0411 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,246 $16,912 Implemented
LE0411 # 01 Y:2016 01 2016 INSTALL TIMERS AND/OR THERMOSTATS $22 $0 Implemented
LE0411 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,142 $25 Implemented
LE0411 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $3,533 $150 Implemented
LE0411 # 04 Y:2016 04 2016 INSTALL TIMERS AND/OR THERMOSTATS $3,292 $625 Implemented
LE0411 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $21,409 $9,106 Implemented
LE0411 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,675 $1,000 Implemented
LE0411 # 08 Y:2016 08 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $58,696 $100,000 Implemented
LE0412 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,397 $8,050 Implemented