Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,219
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0202 # 01 Y:2004 | 01 | 2004 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $24,240 | $29,000 | Not Implemented |
LE0202 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,378 | $2,500 | Implemented |
LE0202 # 02 Y:2004 | 02 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,420 | $13,640 | Implemented |
LE0202 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $879 | $0 | Implemented |
LE0202 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $397 | $500 | Implemented |
LE0202 # 06 Y:2004 | 06 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $220 | $0 | Implemented |
LE0201 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $196 | $150 | Not Implemented |
LE0201 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,356 | $2,500 | Implemented |
LE0201 # 04 Y:2004 | 04 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,622 | $450 | Not Implemented |
LE0201 # 05 Y:2004 | 05 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $551 | $150 | Implemented |
LE0201 # 07 Y:2004 | 07 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,924 | $2,115 | Implemented |
LE0201 # 02 Y:2004 | 02 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,658 | $0 | Not Implemented |
LE0201 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,994 | $0 | Implemented |
LE0200 # 03 Y:2004 | 03 | 2004 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $3,305 | $800 | Implemented |
LE0200 # 02 Y:2004 | 02 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $9,386 | $360 | Not Implemented |
LE0200 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,878 | $4,000 | Implemented |
LE0200 # 10 Y:2004 | 10 | 2004 | USE OPTIMUM THICKNESS INSULATION | $768 | $300 | Implemented |
LE0200 # 11 Y:2004 | 11 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $657 | $380 | Implemented |
LE0200 # 01 Y:2004 | 01 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,210 | $3,000 | Implemented |
LE0200 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,198 | $0 | Implemented |
LE0200 # 08 Y:2004 | 08 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $904 | $500 | Implemented |
LE0200 # 07 Y:2004 | 07 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,132 | $400 | Implemented |
LE0200 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,266 | $750 | Implemented |
LE0200 # 09 Y:2004 | 09 | 2004 | IMPROVE COMBUSTION CONTROL CAPABILITY | $857 | $200 | Implemented |
WV0305 # 16 Y:2004 | 16 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $355 | $370 | Not Implemented |