Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
104
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0197 # 11 Y:2021 | 11 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,320 | $14,125 | Not Implemented |
DL0197 # 02 Y:2021 | 02 | 2021 | ADD AREA LIGHTING SWITCHES | $21,520 | $846 | Not Implemented |
DL0197 # 01 Y:2021 | 01 | 2021 | USE OPTIMUM TEMPERATURE | $8,560 | $0 | Not Implemented |
DL0197 # 03 Y:2021 | 03 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,710 | $0 | Implemented |
DL0197 # 04 Y:2021 | 04 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $730 | $135 | Implemented |
DL0197 # 08 Y:2021 | 08 | 2021 | REPLACE BOILER | $8,560 | $23,609 | Not Implemented |
DL0197 # 10 Y:2021 | 10 | 2021 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,950 | $9,070 | Not Implemented |
DL0197 # 06 Y:2021 | 06 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,960 | $173,544 | Implemented |
DL0197 # 09 Y:2021 | 09 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,313 | $39,529 | Implemented |
DL0197 # 07 Y:2021 | 07 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,810 | $1,098 | Not Implemented |
DL0197 # 05 Y:2021 | 05 | 2021 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,034 | $1,300 | Implemented |
LE0516 # 04 Y:2021 | 04 | 2021 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $8,448 | $25,000 | Not Implemented |
LE0516 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,511 | $200 | Implemented |
LE0516 # 06 Y:2021 | 06 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,727 | $36,000 | Not Implemented |
LE0516 # 02 Y:2021 | 02 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,124 | $1,200 | Implemented |
LE0516 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,984 | $30,000 | Not Implemented |
LE0516 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,118 | $11,000 | Not Implemented |
LE0515 # 06 Y:2021 | 06 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $150,000 | $700,000 | Implemented |
LE0515 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,979 | $10,500 | Not Implemented |
LE0515 # 07 Y:2021 | 07 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $622 | $3,000 | Not Implemented |
LE0515 # 03 Y:2021 | 03 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,441 | $1,500 | Implemented |
LE0515 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,306 | $1,500 | Implemented |
LE0515 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,213 | $0 | Implemented |
LE0515 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,658 | $6,990 | Implemented |
LE0514 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,274 | $37,000 | Not Implemented |