Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0628 # 01 Y:1997 | 01 | 1997 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $86,500 | $120,000 | n/a |
GT0628 # 02 Y:1997 | 02 | 1997 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $186,200 | $245,000 | n/a |
GT0628 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,903 | $37,960 | n/a |
GT0628 # 04 Y:1997 | 04 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,263 | $5,550 | n/a |
GT0628 # 05 Y:1997 | 05 | 1997 | MINIMIZE WATER USAGE | $2,924 | $0 | n/a |
GT0628 # 06 Y:1997 | 06 | 1997 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $23,066 | $72,100 | n/a |
GT0628 # 07 Y:1997 | 07 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $37,000 | $0 | n/a |
NC0113 # 09 Y:1997 | 09 | 1997 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $11,000 | $10,500 | Not Implemented |
NC0113 # 08 Y:1997 | 08 | 1997 | HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME | $163,000 | $8,000 | Not Implemented |
NC0113 # 07 Y:1997 | 07 | 1997 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $5,500 | $5,200 | Not Implemented |
NC0113 # 06 Y:1997 | 06 | 1997 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $831 | $500 | Not Implemented |
NC0113 # 05 Y:1997 | 05 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $226 | $1,400 | Not Implemented |
NC0113 # 04 Y:1997 | 04 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $863 | $210 | Implemented |
NC0113 # 03 Y:1997 | 03 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $252 | $240 | Not Implemented |
NC0113 # 02 Y:1997 | 02 | 1997 | REVISE SMOKE CLEANUP FROM OPERATIONS | $1,447 | $3,400 | Not Implemented |
NC0113 # 01 Y:1997 | 01 | 1997 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,733 | $15,000 | Not Implemented |
NC0113 # 10 Y:1997 | 10 | 1997 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $32,711 | $56,000 | Not Implemented |
TN0609 # 01 Y:1997 | 01 | 1997 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $83,060 | $19,080 | Not Implemented |
TN0609 # 02 Y:1997 | 02 | 1997 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $64,970 | $45,880 | Not Implemented |
TN0609 # 03 Y:1997 | 03 | 1997 | ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT | $10,970 | $5,080 | Not Implemented |
TN0609 # 04 Y:1997 | 04 | 1997 | USE EVAPORATION TO CONCENTRATE MATERIAL | $8,030 | $20,880 | Not Implemented |
TN0609 # 05 Y:1997 | 05 | 1997 | INSTALL TIMERS AND/OR THERMOSTATS | $5,330 | $6,200 | Implemented |
TN0609 # 06 Y:1997 | 06 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $860 | $600 | Not Implemented |
GT0609 # 07 Y:1997 | 07 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,860 | $11,000 | Implemented |
GT0609 # 06 Y:1997 | 06 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,245 | $4,110 | Implemented |