IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

396

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0445 # 02 Y:2009 02 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $962 $81 Not Implemented
IA0445 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,949 $19,383 Not Implemented
IA0433 # 11 Y:2008 11 2008 ADJUST VENTS TO MINIMIZE ENERGY USE $3,380 $294 Implemented
IA0433 # 10 Y:2008 10 2008 INSULATE BARE EQUIPMENT $524 $254 Not Implemented
IA0433 # 09 Y:2008 09 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,158 $4,624 Not Implemented
IA0433 # 08 Y:2008 08 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $587 $142 Implemented
IA0433 # 07 Y:2008 07 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,364 $4,000 Implemented
IA0433 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,324 $37,346 Not Implemented
IA0433 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $13,871 $1,700 Not Implemented
IA0433 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,195 $54 Implemented
IA0433 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,886 $832 Implemented
IA0433 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,622 $459 Implemented
IA0433 # 01 Y:2008 01 2008 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $52,036 $0 Not Implemented
IA0357 # 07 Y:2004 07 2004 $206,874 $145,850 Implemented
IA0357 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $447 $654 Implemented
IA0357 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,027 $23 Implemented
IA0357 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $657 $262 Implemented
IA0357 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,125 $25 Not Implemented
IA0357 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,225 $349 Implemented
IA0357 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $1,879 $2,445 Implemented
IA0353 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $527 $599 Not Implemented
IA0353 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $673 $1,641 Not Implemented
IA0353 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $603 $444 Implemented
IA0353 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21 $11 Implemented
IA0353 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $950 $557 Implemented