IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0143 # 08 Y:1999 08 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $175 $0 Not Implemented
DS0143 # 07 Y:1999 07 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $8,760 $90 Implemented
DS0143 # 06 Y:1999 06 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,043 $640 Implemented
DS0143 # 05 Y:1999 05 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $16,588 $20 Not Implemented
DS0143 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $16,788 $3,567 Not Implemented
DS0143 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,280 $2,400 Implemented
DS0143 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $4,177 $7,500 Implemented
DS0143 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $800 $135 Implemented
DS0142 # 04 Y:1999 04 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $721 $1,811 Not Implemented
DS0142 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,613 $1,613 Not Implemented
DS0142 # 02 Y:1999 02 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $676 $400 Not Implemented
DS0142 # 03 Y:1999 03 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $3,900 $1,000 Not Implemented
DS0135 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $11,263 $22,640 Not Implemented
DS0135 # 09 Y:1999 09 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $14,276 $9,589 Implemented
DS0135 # 08 Y:1999 08 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $1,875 $3,856 Not Implemented
DS0135 # 07 Y:1999 07 1999 INCREASE USE OF AUTOMATION $3,744 $160 Implemented
DS0135 # 06 Y:1999 06 1999 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $3,290 $12,726 Implemented
DS0135 # 05 Y:1999 05 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,203 $15,000 Not Implemented
DS0135 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $5,760 $6,500 Not Implemented
DS0135 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,395 $351 Implemented
DS0135 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $835 $2,974 Implemented
DS0130 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,845 $100 Implemented
DS0130 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,448 $7,644 Not Implemented
DS0130 # 02 Y:1999 02 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $988 $750 Not Implemented
DS0130 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $3,384 $2,175 Not Implemented