IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0044 # 08 Y:2009 08 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,476 $4,900 Implemented
TT0044 # 07 Y:2009 07 2009 USE COMPRESSOR AIR FILTERS $323 $75 Implemented
TT0044 # 06 Y:2009 06 2009 REPAIR OR REPLACE STEAM TRAPS $1,748 $4,000 Implemented
TT0044 # 05 Y:2009 05 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,904 $30,870 Implemented
TT0044 # 04 Y:2009 04 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,180 $2,000 Implemented
TT0044 # 03 Y:2009 03 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $7,850 $6,000 Implemented
TT0044 # 02 Y:2009 02 2009 REDUCE VENTILATION AIR $3,415 $0 Implemented
TT0045 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,434 $45,960 Implemented
TT0045 # 01 Y:2009 01 2009 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $100,429 $34,284 Implemented
TT0045 # 05 Y:2009 05 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $48,659 $64,000 Implemented
TT0041 # 01 Y:2009 01 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,330 $0 Implemented
TT0041 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,503 $0 Implemented
TT0041 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,050 $0 Implemented
TT0042 # 01 Y:2009 01 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,600 $28,400 Implemented
TT0042 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $16,800 $2,900 Implemented
TT0043 # 03 Y:2009 03 2009 Close Cycle Water Use $2,148 $2,568 Implemented
TT0043 # 02 Y:2009 02 2009 Hardware $11,711 $300 Implemented
TT0043 # 01 Y:2009 01 2009 Reduction $5,562 $2,500 Implemented
TT0043 # 05 Y:2009 05 2009 Hardware $3,007 $1,395 Implemented
TT0040 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,450 $800 Implemented
TT0040 # 03 Y:2009 03 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $24,648 $0 Implemented
TT0040 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,600 $0 Implemented
TT0040 # 08 Y:2009 08 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,000 $0 Implemented
TT0040 # 09 Y:2009 09 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,500 $0 Implemented
TT0040 # 06 Y:2009 06 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $39,750 $0 Implemented