Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
201
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0800 # 01 Y:2005 | 01 | 2005 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $241,590 | $283,800 | Implemented |
GT0800 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,617 | $22,400 | Implemented |
GT0800 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,010 | $850 | Implemented |
TN0650 # 02 Y:1999 | 02 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,400 | $0 | Implemented |
TN0650 # 03 Y:1999 | 03 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $8,150 | $0 | Implemented |
TN0626 # 03 Y:1998 | 03 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,860 | $4,550 | Implemented |
TN0626 # 04 Y:1998 | 04 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,535 | $0 | Implemented |
AR0122 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $396 | $642 | Implemented |
AR0122 # 03 Y:1997 | 03 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,490 | $220 | Implemented |
AR0122 # 04 Y:1997 | 04 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,860 | $1,000 | Implemented |
AR0122 # 06 Y:1997 | 06 | 1997 | RECOVER AND REUSE COOLING WATER | $5,497 | $4,200 | Implemented |
AR0122 # 07 Y:1997 | 07 | 1997 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $584 | $100 | Implemented |
AR0122 # 08 Y:1997 | 08 | 1997 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,518 | $325 | Implemented |
TN0596 # 02 Y:1996 | 02 | 1996 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $80,150 | $1,130 | Implemented |
TN0596 # 05 Y:1996 | 05 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,870 | $4,200 | Implemented |
TN0596 # 06 Y:1996 | 06 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,170 | $7,000 | Implemented |
TN0596 # 07 Y:1996 | 07 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $580 | $410 | Implemented |
TN0583 # 04 Y:1996 | 04 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $715 | $260 | Implemented |
TN0481 # 01 Y:1993 | 01 | 1993 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,814 | $9,000 | Implemented |
TN0481 # 03 Y:1993 | 03 | 1993 | IMPROVE COMBUSTION CONTROL CAPABILITY | $459 | $625 | Implemented |
TN0481 # 04 Y:1993 | 04 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,512 | $510 | Implemented |
TN0481 # 05 Y:1993 | 05 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,178 | $741 | Implemented |
TN0454 # 01 Y:1992 | 01 | 1992 | INCREASE AMOUNT OF CONDENSATE RETURNED | $12,838 | $10,750 | Implemented |
TN0454 # 02 Y:1992 | 02 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,912 | $1,000 | Implemented |
TN0454 # 03 Y:1992 | 03 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,682 | $1,000 | Implemented |