IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

468

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0012 # 02 Y:2007 02 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,237 $200 Implemented
TT0012 # 03 Y:2007 03 2007 Leaks and Insulation $9,860 $1,491 Implemented
TT0012 # 04 Y:2007 04 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $31,671 $79,800 Not Implemented
TT0012 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $343 $868 Implemented
TT0012 # 06 Y:2007 06 2007 $648 $1,275 Not Implemented
TT0012 # 07 Y:2007 07 2007 INSULATE BARE EQUIPMENT $45,660 $28,527 Not Implemented
TT0012 # 08 Y:2007 08 2007 $2,490 $1,019 Not Implemented
MS0270 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $207,595 $1,008,706 Implemented
MS0270 # 02 Y:2005 02 2005 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $62,790 $34,773 Not Implemented
MS0270 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,478 $89,204 Implemented
MS0270 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,299 $0 Implemented
MS0270 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,451 $228 Implemented
MS0270 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,035 $0 Not Implemented
MS0270 # 07 Y:2005 07 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $877 $0 Implemented
MS0270 # 08 Y:2005 08 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $635 $1,300 Not Implemented
GT0728 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,492 $750 Implemented
GT0728 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,952 $6,346 Implemented
GT0728 # 03 Y:2002 03 2002 MAINTAIN MACHINES TO REDUCE LEAKS $2,765 $3,150 Not Implemented
GT0728 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,916 $0 Implemented
GT0728 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $2,356 $1,555 Not Implemented
TN0688 # 01 Y:2000 01 2000 RECOVER AND REUSE WASTE MATERIAL $34,250 $131,500 Not Implemented
TN0688 # 02 Y:2000 02 2000 $211,827 $100,400 Implemented
TN0688 # 03 Y:2000 03 2000 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $29,380 $27,925 Not Implemented
TN0688 # 04 Y:2000 04 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $23,435 $12,800 Not Implemented
TN0688 # 05 Y:2000 05 2000 REDUCE SCRAP PRODUCTION $29,580 $0 Not Implemented