Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
96
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0263 # 01 Y:2021 | 01 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $45,807 | $72,000 | Not Implemented |
TT0263 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,566 | $6,725 | Not Implemented |
TT0263 # 04 Y:2021 | 04 | 2021 | ADOPT IN-HOUSE MATERIAL GENERATION | $9,686 | $17,700 | Not Implemented |
TT0263 # 05 Y:2021 | 05 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,140 | $5,000 | Not Implemented |
TT0263 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,663 | $88,815 | Implemented |
TT0262 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,405 | $1,640 | Not Implemented |
TT0262 # 01 Y:2021 | 01 | 2021 | USE SOLAR HEAT FOR HEAT | $44,686 | $476,000 | Not Implemented |
TT0262 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,023 | $2,762 | Implemented |
TT0262 # 04 Y:2021 | 04 | 2021 | INSULATE BARE EQUIPMENT | $4,646 | $3,879 | Implemented |
TT0262 # 02 Y:2021 | 02 | 2021 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $7,441 | $15,000 | Not Implemented |
TT0261 # 03 Y:2021 | 03 | 2021 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $30,912 | $38,200 | Not Implemented |
TT0261 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $49,358 | $3,200 | Implemented |
TT0261 # 09 Y:2021 | 09 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $703 | $850 | Not Implemented |
TT0261 # 01 Y:2021 | 01 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $188,912 | $733,702 | Implemented |
TT0261 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,718 | $15,000 | Not Implemented |
TT0261 # 05 Y:2021 | 05 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,133 | $3,000 | Not Implemented |
TT0261 # 08 Y:2021 | 08 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,221 | $9,600 | Not Implemented |
TT0261 # 07 Y:2021 | 07 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,374 | $0 | Implemented |
TT0261 # 04 Y:2021 | 04 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $26,082 | $700 | Implemented |
TT0259 # 06 Y:2021 | 06 | 2021 | INSULATE BARE EQUIPMENT | $5,951 | $1,314 | Not Implemented |
TT0259 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,779 | $2,738 | Implemented |
TT0259 # 07 Y:2021 | 07 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,907 | $5,500 | Not Implemented |
TT0259 # 08 Y:2021 | 08 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $1,752 | $400 | Not Implemented |
TT0259 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,579 | $16,000 | Not Implemented |
TT0259 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $300,781 | $111,421 | Implemented |