IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

81

matching recommendations
Reset
SIC 3462 Iron And Steel Forgings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0312 # 01 Y:1998 01 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $30,640 $1,200 Implemented
AM0312 # 02 Y:1998 02 1998 REPAIR AND ELIMINATE STEAM LEAKS $24,560 $5,000 Implemented
AM0312 # 03 Y:1998 03 1998 METER WASTE WATER $17,000 $4,800 Implemented
AM0312 # 04 Y:1998 04 1998 OPTIMIZE PLANT POWER FACTOR $3,700 $8,650 Implemented
AM0312 # 05 Y:1998 05 1998 INSULATE BARE EQUIPMENT $2,780 $2,790 Implemented
AM0312 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,790 $15 Implemented
AM0312 # 07 Y:1998 07 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $1,710 $1,250 Implemented
AM0312 # 09 Y:1998 09 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $465 $30 Implemented
AM0312 # 10 Y:1998 10 1998 PAY UTILITY BILLS ON TIME $310 $0 Implemented
AM0157 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,470 $4,080 Implemented
AM0157 # 01 Y:1992 01 1992 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $67,280 $2,250 Implemented
AM0157 # 02 Y:1992 02 1992 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $37,400 $53,200 Implemented
AM0157 # 03 Y:1992 03 1992 INSULATE BARE EQUIPMENT $32,285 $96,000 Implemented
AM0157 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,180 $630 Implemented
AM0157 # 04 Y:1992 04 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,410 $0 Implemented
AM0157 # 07 Y:1992 07 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $960 $0 Implemented
AM0116 # 01 Y:1991 01 1991 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $114,570 $157,300 Not Implemented
AM0116 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $817 $1,117 Not Implemented
AM0116 # 03 Y:1991 03 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,180 $660 Not Implemented
AM0116 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,055 $0 Not Implemented
AM0116 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $450 $1,005 Not Implemented
AM0116 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28 $12 Not Implemented
AM0095 # 01 Y:1990 01 1990 REPAIR AND ELIMINATE STEAM LEAKS $75,970 $37,000 Not Implemented
AM0095 # 10 Y:1990 10 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164 $60 Not Implemented
AM0095 # 09 Y:1990 09 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,185 $425 Not Implemented