IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

420

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0892 # 13 Y:2014 13 2014 INSULATE BARE EQUIPMENT $2,848 $899 Not Implemented
AM0646 # 11 Y:2013 11 2013 USE SYNTHETIC LUBRICANT $215 $0 Implemented
AM0646 # 10 Y:2013 10 2013 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $440 $0 Implemented
AM0646 # 09 Y:2013 09 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,385 $0 Implemented
AM0646 # 08 Y:2013 08 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,470 $770 Implemented
AM0646 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,850 $500 Implemented
AM0646 # 06 Y:2013 06 2013 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $2,505 $5,010 Not Implemented
AM0646 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,610 $2,250 Implemented
AM0646 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,470 $2,800 Not Implemented
AM0646 # 03 Y:2013 03 2013 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $10,300 $300 Not Implemented
AM0646 # 02 Y:2013 02 2013 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $42,430 $14,500 Not Implemented
AM0646 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,500 $242,900 Not Implemented
AM0645 # 01 Y:2013 01 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,885 $63,000 Implemented
AM0645 # 02 Y:2013 02 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,290 $750 Implemented
AM0645 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $570 $60 Implemented
AM0645 # 04 Y:2013 04 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,070 $0 Not Implemented
AM0645 # 05 Y:2013 05 2013 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $480 $1,000 Not Implemented
AM0623 # 07 Y:2012 07 2012 TREAT AND REUSE RINSE WATERS $3,300 $3,000 Not Implemented
AM0623 # 06 Y:2012 06 2012 OPTIMIZE PLANT POWER FACTOR $4,500 $8,160 Not Implemented
AM0623 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,538 $1,045 Not Implemented
AM0623 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,838 $500 Not Implemented
AM0623 # 03 Y:2012 03 2012 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $36,640 $10,000 Not Implemented
AM0623 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,800 $13,240 Not Implemented
AM0623 # 01 Y:2012 01 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $75,600 $270,000 Not Implemented
AM0623 # 09 Y:2012 09 2012 USE SYNTHETIC LUBRICANT $1,010 $0 Not Implemented