IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0515 # 06 Y:2006 06 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,500 $6,700 Implemented
AM0515 # 07 Y:2006 07 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,580 $27,400 Implemented
AM0515 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $4,440 $1,580 Implemented
AM0514 # 01 Y:2006 01 2006 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $189,400 $50,000 Implemented
AM0514 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,900 $500 Implemented
AM0514 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $2,520 $790 Implemented
AM0514 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,305 $1,450 Implemented
TA0076 # 03 Y:2004 03 2004 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,113 $0 Implemented
TA0076 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $3,277 $0 Implemented
TA0076 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,001 $720 Implemented
TA0059 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,885 $7,671 Implemented
TA0059 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,890 $200 Implemented
TA0036 # 06 Y:2002 06 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $100 $0 Implemented
TA0036 # 01 Y:2002 01 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,000 $0 Implemented
TA0036 # 02 Y:2002 02 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $2,100 $0 Implemented
TA0036 # 03 Y:2002 03 2002 PAY UTILITY BILLS ON TIME $1,326 $0 Implemented
TP0003 # 06 Y:1999 06 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $514 $190 Implemented
TP0003 # 05 Y:1999 05 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $387 $12,392 Implemented
TP0003 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $111 $393 Implemented
TP0003 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $642 $20 Implemented
TP0003 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,133 $0 Implemented
AM0342 # 06 Y:1999 06 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $261 $40 Implemented
KG0003 # 07 Y:1994 07 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $372 $1,186 Implemented
KG0003 # 05 Y:1994 05 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,629 $2,500 Implemented
KG0003 # 03 Y:1994 03 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,257 $2,200 Implemented