Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
222
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0161 # 05 Y:2020 | 05 | 2020 | ISOLATE HOT OR COLD EQUIPMENT | $2,460 | $9,000 | Not Implemented |
UU0161 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,780 | $6,880 | Implemented |
UU0161 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,315 | $7,880 | Implemented |
UU0161 # 02 Y:2020 | 02 | 2020 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $22,840 | $53,000 | Implemented |
UU0161 # 01 Y:2020 | 01 | 2020 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $43,260 | $86,000 | Implemented |
UU0161 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,370 | $5,370 | Not Implemented |
UU0160 # 01 Y:2020 | 01 | 2020 | INCREASE AMOUNT OF CONDENSATE RETURNED | $47,740 | $212,490 | Implemented |
UU0160 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,050 | $179,660 | Implemented |
UU0160 # 03 Y:2020 | 03 | 2020 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $30,330 | $4,800 | Not Implemented |
UU0160 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $14,460 | $13,100 | Implemented |
UU0160 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,220 | $23,540 | Implemented |
UU0160 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $960 | $1,140 | Not Implemented |
UU0160 # 07 Y:2020 | 07 | 2020 | Hire Energy Manager | $50,000 | $2,700 | Not Implemented |
UU0158 # 07 Y:2019 | 07 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $306 | $260 | Implemented |
UU0158 # 06 Y:2019 | 06 | 2019 | ELIMINATE/REDUCE AN OPERATION | $445 | $0 | Implemented |
UU0158 # 05 Y:2019 | 05 | 2019 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $451 | $1,100 | Implemented |
UU0158 # 04 Y:2019 | 04 | 2019 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $740 | $800 | Not Implemented |
UU0158 # 01 Y:2019 | 01 | 2019 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $6,933 | $50,000 | Not Implemented |
UU0158 # 02 Y:2019 | 02 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,811 | $160 | Not Implemented |
UU0158 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,726 | $2,762 | Implemented |
UU0151 # 07 Y:2019 | 07 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,760 | $100 | Not Implemented |
UU0151 # 01 Y:2019 | 01 | 2019 | OPERATE BOILERS ON HIGH FIRE SETTING | $63,057 | $1,000 | Not Implemented |
UU0151 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $17,315 | $25,000 | Not Implemented |
UU0151 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,157 | $1,000 | Not Implemented |
UU0151 # 06 Y:2019 | 06 | 2019 | INSTALL OCCUPANCY SENSORS | $1,973 | $7,800 | Not Implemented |