IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

100

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0113 # 04 Y:2006 04 2006 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $87,860 $500,000 Not Implemented
UU0113 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,530 $20,000 Not Implemented
UU0113 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $173,190 $46,250 Not Implemented
UU0113 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,620 $180 Not Implemented
UU0111 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $22,930 $20,000 Not Implemented
UU0111 # 02 Y:2006 02 2006 INSTALL COMMON HEADER ON COMPRESSORS $1,760 $8,000 Not Implemented
UU0111 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,680 $1,560 Not Implemented
UU0111 # 05 Y:2006 05 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,860 $33,500 Not Implemented
UU0111 # 06 Y:2006 06 2006 USE RADIANT HEATER FOR SPOT HEATING $3,330 $17,000 Not Implemented
UU0111 # 04 Y:2006 04 2006 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,320 $605 Not Implemented
UU0110 # 02 Y:2006 02 2006 ISOLATE HOT OR COLD EQUIPMENT $4,260 $3,550 Not Implemented
UU0110 # 07 Y:2006 07 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $277,000 $7,378,000 Not Implemented
UU0110 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,440 $29,070 Not Implemented
UU0110 # 05 Y:2006 05 2006 PAY BILLS ON TIME TO AVOID LATE FEES $2,640 $0 Not Implemented
UU0110 # 04 Y:2006 04 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $126,380 $403,440 Not Implemented
UU0110 # 03 Y:2006 03 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,350 $6,900 Not Implemented
UU0110 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,520 $2,095 Not Implemented
UU0112 # 02 Y:2006 02 2006 REPAIR OR REPLACE STEAM TRAPS $121,540 $8,720 Not Implemented
UU0112 # 05 Y:2006 05 2006 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $65,810 $442,960 Not Implemented
UU0112 # 01 Y:2006 01 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $0 $0 Not Implemented
UU0112 # 03 Y:2006 03 2006 CLOSE OFF UNNEEDED STEAM LINES $140,530 $250,000 Not Implemented
UU0112 # 04 Y:2006 04 2006 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $69,680 $200,000 Not Implemented
UU0112 # 06 Y:2006 06 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,030 $0 Not Implemented
UU0109 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,730 $970 Not Implemented
UU0109 # 05 Y:2006 05 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $3,360 $2,960 Not Implemented