IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

109

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0158 # 07 Y:2019 07 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $306 $260 Implemented
UU0158 # 06 Y:2019 06 2019 ELIMINATE/REDUCE AN OPERATION $445 $0 Implemented
UU0158 # 05 Y:2019 05 2019 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $451 $1,100 Implemented
UU0158 # 04 Y:2019 04 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $740 $800 Not Implemented
UU0158 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,726 $2,762 Implemented
UU0158 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,811 $160 Not Implemented
UU0158 # 01 Y:2019 01 2019 USE A DIFFERENT OR RECYCLED RAW MATERIAL $6,933 $50,000 Not Implemented
UU0157 # 07 Y:2019 07 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,880 $650 Implemented
UU0157 # 06 Y:2019 06 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,916 $3,800 Implemented
UU0157 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $314 $218 Implemented
UU0157 # 04 Y:2019 04 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,094 $8,488 Implemented
UU0157 # 03 Y:2019 03 2019 USE RADIANT HEATER FOR SPOT HEATING $12,670 $22,920 Implemented
UU0157 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $2,079 $4,000 Implemented
UU0157 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,321 $68,567 Implemented
UU0156 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $3,874 $3,125 Implemented
UU0156 # 05 Y:2019 05 2019 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $1,315 $2,600 Not Implemented
UU0156 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,497 $2,300 Implemented
UU0156 # 03 Y:2019 03 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,768 $12,634 Not Implemented
UU0156 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,961 $2,600 Not Implemented
UU0156 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,712 $2,024 Implemented
UU0155 # 01 Y:2019 01 2019 ADOPT IN-HOUSE MATERIAL GENERATION $102,278 $823,000 Implemented
UU0155 # 02 Y:2019 02 2019 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $14,015 $46,625 Not Implemented
UU0155 # 03 Y:2019 03 2019 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $898 $1,650 Implemented
UU0154 # 02 Y:2019 02 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $262,908 $2,299,950 Not Implemented
UU0154 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $170,761 $461,313 Implemented