IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0171 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,725 $1,500 Not Implemented
UU0171 # 03 Y:2020 03 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,190 $1,100 Not Implemented
UU0171 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,969 $4,000 Implemented
UU0171 # 01 Y:2020 01 2020 ELIMINATE/REDUCE AN OPERATION $43,211 $85,000 Implemented
UU0170 # 06 Y:2020 06 2020 INSULATE BARE EQUIPMENT $676 $440 Implemented
UU0170 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $1,259 $1,259 Not Implemented
UU0170 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,521 $150 Implemented
UU0170 # 03 Y:2020 03 2020 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $1,681 $1,200 Not Implemented
UU0170 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $13,868 $2,000 Implemented
UU0170 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,825 $21,841 Implemented
UU0169 # 03 Y:2020 03 2020 USE OPTIMUM TEMPERATURE $4,303 $0 Implemented
UU0169 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,976 $124,680 Implemented
UU0169 # 02 Y:2020 02 2020 USE EXISTING DAM TO GENERATE ELECTRICITY $24,451 $120,000 Not Implemented
UU0169 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $514 $2,100 Implemented
UU0168 # 03 Y:2020 03 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,221 $8,000 Not Implemented
UU0168 # 01 Y:2020 01 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,906 $0 Implemented
UU0168 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,729 $15,550 Implemented
UU0168 # 04 Y:2020 04 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,063 $0 Implemented
UU0168 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $251 $0 Implemented
UU0168 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $178 $0 Implemented
UU0167 # 01 Y:2020 01 2020 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $471,950 $2,795,000 Not Implemented
UU0167 # 02 Y:2020 02 2020 TREAT AND REUSE RINSE WATERS $72,249 $60,000 Implemented
UU0167 # 03 Y:2020 03 2020 CHANGE METHOD OF DEIONIZED WATER PRODUCTION $35,350 $180,000 Implemented
UU0167 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,178 $17,274 Implemented
UU0167 # 04 Y:2020 04 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $12,331 $22,500 Not Implemented