IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

156

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0423 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $4,313 $12,378 Not Implemented
NC0423 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,230 $4,585 Implemented
NC0423 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,209 $115,608 Implemented
NC0423 # 05 Y:2011 05 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $86,720 $87,892 Not Implemented
NC0423 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $24,869 $42,000 Not Implemented
NC0423 # 03 Y:2011 03 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $26,211 $60,000 Not Implemented
NC0423 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,736 $100 Implemented
NC0423 # 01 Y:2011 01 2011 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $1,468,749 $650,000 Implemented
NC0412 # 08 Y:2010 08 2010 $1,000,000 $2,000,000 Not Implemented
NC0412 # 07 Y:2010 07 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,402 $1,200 Implemented
NC0412 # 06 Y:2010 06 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,349 $13,200 Not Implemented
NC0412 # 05 Y:2010 05 2010 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $7,153 $15,100 Implemented
NC0412 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $2,841 $4,995 Implemented
NC0412 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,233 $100 Implemented
NC0412 # 02 Y:2010 02 2010 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $25,289 $50 Implemented
NC0412 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $140,256 $442,314 Implemented
NC0412 # 09 Y:2010 09 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $91,232 $255,000 Not Implemented
NC0316 # 01 Y:2005 01 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $18,271 $87,125 Not Implemented
NC0316 # 02 Y:2005 02 2005 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $10,570 $26,949 Not Implemented
NC0316 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $491 $321 Not Implemented
NC0316 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $327 $100 Implemented
WV0312 # 11 Y:2005 11 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,460 $0 Implemented
WV0312 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $3,672 $413 Not Implemented
WV0312 # 10 Y:2005 10 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,712 $824 Not Implemented
WV0312 # 12 Y:2005 12 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $706 $120 Implemented