Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
101
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0350 # 02 Y:2006 | 02 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,138 | $10,500 | Not Implemented |
NC0350 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $330 | $100 | Implemented |
NC0350 # 03 Y:2006 | 03 | 2006 | USE OPTIMUM THICKNESS INSULATION | $12,275 | $1,000 | Implemented |
NC0350 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,381 | $2,000 | Not Implemented |
NC0350 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $122,745 | $114,000 | Not Implemented |
NC0340 # 03 Y:2006 | 03 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $4,704 | $1,500 | Implemented |
NC0340 # 12 Y:2006 | 12 | 2006 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $18,650 | $20,000 | Not Implemented |
NC0340 # 11 Y:2006 | 11 | 2006 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $20,000 | $20,000 | Implemented |
NC0340 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $129 | $377 | Not Implemented |
NC0340 # 08 Y:2006 | 08 | 2006 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $272 | $500 | Implemented |
NC0340 # 04 Y:2006 | 04 | 2006 | INSULATE FEEDWATER TANK | $879 | $220 | Implemented |
NC0340 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,390 | $50 | Implemented |
NC0340 # 02 Y:2006 | 02 | 2006 | CLOSE OFF UNNEEDED STEAM LINES | $13,322 | $0 | Implemented |
NC0340 # 01 Y:2006 | 01 | 2006 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,720 | $1,800 | Implemented |
NC0340 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,698 | $7,600 | Not Implemented |
NC0340 # 07 Y:2006 | 07 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,998 | $0 | Implemented |
NC0340 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,146 | $1,700 | Not Implemented |
NC0340 # 13 Y:2006 | 13 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $61,400 | $25,000 | Not Implemented |
NC0344 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $48,795 | $35,000 | Not Implemented |
NC0344 # 01 Y:2006 | 01 | 2006 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $789,735 | $918,265 | Not Implemented |
NC0344 # 05 Y:2006 | 05 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $29,955 | $5,000 | Not Implemented |
NC0344 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,686 | $4,423 | Implemented |
NC0344 # 02 Y:2006 | 02 | 2006 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $460,800 | $118,971 | Implemented |
NC0344 # 04 Y:2006 | 04 | 2006 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $62,722 | $50,000 | Implemented |
NC0343 # 02 Y:2006 | 02 | 2006 | REDESIGN PROCESS | $54,257 | $30,000 | Not Implemented |